My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-038A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:43 PM
Creation date
3/15/2018 11:23:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2018
Control Number
2018-038A
Agenda Item Number
8.S.
Entity Name
Johnson-Davis, Inc.
Subject
Culvert Replacement
Area
74th Avenue and 1st Street SW
Project Number
1737
Bid Number
2018024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County <br />Purchasing Division <br />180027 th Street <br />Page 1 of 2 <br />Vero Beach, FL 32960,�LRI � <br />Phone (772) 226-1416 <br />ADDENDUM NO. 1 <br />Date: January 18, 2017 <br />Project Name: 74th Avenue SW and 15t Street SW Culvert Replacement <br />(IRC -1737) <br />Bid Number: 2018024 <br />Bid Opening Date: Wednesday, January 24, 2018 at 2:00 p.m. <br />This addendum is released to provide the minutes and sign in sheet from the Mandatory Pre -Solicitation Conference. <br />All information provided herein is hereby incorporated into the request for proposal documents. <br />1. Cost Proposals will NO longer be Lump Sum. Replace the Proposal Pricing Form on page 11 of the RFP with <br />the attached "Itemized Cost Proposal Form". <br />2. Request for payment for stored materials MUST be accompanied by a paid invoice. <br />3. Maintenance of Traffic Plan to be prepared by an individual that is FDOT certified to prepare Maintenance <br />of Traffic Plans. At minimum, one (1) lane of traffic must be open at any given time with the appropriate <br />lane closure measures in place per FDOT Index 600 series. Two (2) lanes of traffic are expected to be opened <br />for the majority of the construction schedule. <br />4. The 120" steel pipe will meet the FDOT Spec 943 (8 gauge 5"x1" or 3"x1" corrugated). <br />5. Construction activities over Florida Gas Transmission line must adhere to Florida Gas Transmission standards <br />which can be received from Joseph Sanchez (407) 838-7171 or Russell Maclees (772) 216-7612. <br />Attachments: <br />Itemized Cost Proposal <br />Pre -Solicitation Conference Minutes <br />Pre -Solicitation Conference Sign -In Sheet <br />IRFWCD Permit # 17-33 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1737 74th Ave and 1st SW Culvert Replacement\1-Adm1n\Bid <br />Documents\Addendums\1737_Addendum_20180116 v2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.