Laserfiche WebLink
ITEMIZED COST PROPOSAL 1-17-18 <br />PROJECT NAME: 74th AVENUE SW AND 1st STREET SW CULVERT REPLACEMENT <br />PROJECT NO: IRC -1737, BID NO. 2018024 <br />BIDDER'S NAME: <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\11737 74th Ave and 1stSW Culvert Replacement\3-Design\EstimatesXI737 Itemized Cost <br />Proposal20180117 <br />PM 100111'V*11'111' <br />101-1 <br />MOBILIZATION <br />LS <br />1 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />104-1 <br />PREVENTION, CONTROL AND ABATEMENT OF EROSION <br />AND WATER POLLUTION <br />LS <br />1 <br />104-2 <br />BY-PASS PUMP & TEMPORARY CHECK DAMS <br />LS <br />1 <br />110-1-1 <br />CLEARING & GRUBBING <br />LS <br />1 <br />120-1 <br />REGULAR EXCAVATON <br />LS <br />1 <br />120-6 <br />EMBANKMENT <br />LS <br />1 <br />125-1 <br />EXCAVATION FOR STRUCTURES <br />CY <br />64 <br />160-4 <br />TYPE B STABILIZATION (12" THICK, LBR 40) <br />Syl <br />333 <br />430-175-199 <br />PIPE CULVERT, ROUND, 120" S/CD (CSP) <br />LF <br />50 <br />455-133-2 <br />SHEET PILING STEEL, TEMPORARY -CRITICAL <br />SF <br />420 <br />530-3-3 <br />RIPRAP, RUBBLE, F&I, BANK AND SHORE <br />TN <br />100 <br />530-3-4 <br />RIPRAP, RUBBLE, F&I, DITCH LINING <br />TNI <br />30 <br />536-1-0 <br />GUARDRAIL -ROADWAY, GENERAL/LOW SPEED TL -2 <br />LF1 <br />175 <br />570-1-2 IPERFORMANCE <br />TURF, SOD (BAHIA) <br />SY1 <br />106 <br />999-1 1AS-BUILT <br />DRAWING BY REGISTERED SURVEYOR) <br />LS <br />1 <br />SUB -TOTAL <br />FORCE ACCOUNT <br />17,000.00 <br />TOTAL PROJECT PROPOSAL (INCLUDING FORCE ACCOUNT) <br />74th AVENUE SW AND 1st STREET SW CULVERT REPLACEMENT TOTAL <br />TOTAL PROJECT COST PROPOSAL IN WORDS <br />NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br />AND THE ITEMIZED COST PROPOSAL, THE BID DOCUMENTS WILL GOVERN. <br />LS=Lump Sum CY--CubIc Yard LF=Linear Foot TN=Ton SY=Square Yard <br />F:\PublicWorks\ENGINEERING DIVISION PROJECTS\11737 74th Ave and 1stSW Culvert Replacement\3-Design\EstimatesXI737 Itemized Cost <br />Proposal20180117 <br />