My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-038A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:43:43 PM
Creation date
3/15/2018 11:23:59 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2018
Control Number
2018-038A
Agenda Item Number
8.S.
Entity Name
Johnson-Davis, Inc.
Subject
Culvert Replacement
Area
74th Avenue and 1st Street SW
Project Number
1737
Bid Number
2018024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL CONDITIONS FOR PERMIT NO. 17-33 <br />FOR <br />INDIAN RIVER COUNTY PUBLIC WORKS DEPARTMENT <br />REPLACEMENT OF EXISTING FAILED CULVERT IN <br />SUB -LATERAL C-1 (IST STREET, SW) CANAL UNDER 74TH AVENUE <br />(DISCHARGING INTO LATERAL "C" CANAL) WITH <br />50 L.F. OF 12011 A.C.M.P. <br />1) This permit is issued based on plans (5 sheets) (County Project # IRC -1737) <br />prepared by Engineering Division, Indian River County Department of Public <br />Works, dated November 13-15, 2017. <br />2) Proposed 120" A.C.M.P. culvert shall be installed with an East Invert of 11.3 <br />and a West Invert of 11.4 (N.A.V.D. '88). <br />3) Blockage of flow in the Lateral "C" (74th Avenue) Canal is strictly prohibited. <br />Any temporary blockage of flow in Sub -lateral C-1 (1St Street, SW) Canal <br />shall be coordinated and approved by David E. Gunter, Superintendent of the <br />Indian River Farms Water Control District prior to commencement of project. <br />4) Any proposed roadway (74th Avenue) swale drainage into Sub -lateral C-1 <br />Canal shall be through drop pipe discharge culvert. <br />5) All final grading at project site shall be away from top of canal banks with <br />sufficient drainage to prevent accumulation of surface water resulting in <br />overbank discharge into canal. <br />J.-WEOSPEC COND-PROVISM2017 PermitsUdwcd spec Gond 17-33.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.