Laserfiche WebLink
3:02 Daysto Achieve Substantial Completion, final Campletion:and Final Payment' <br />A. The Work will be completed and ready for final payment on or before the 60th day after the date <br />when the. Contract Times commence to run. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER <br />will suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 <br />above, plus any extensions thereof allowed in writing as .a change order to this Agreement. <br />Liquidated damages will commence for this portion of work. The parties also recognize -the delays, <br />expense, and difficulties involved in proving in a legal proceedingthe actual loss.suffered byOWNER <br />F:\Purchas1ng\Bids\2o17-2018 H (2018000)\2018033 RFP for Blue Cypress Culvert Replacement\Agreement.docx <br />Page i of 11- - . . <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY- a Political. Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Hinterland <br />Group, Inc. (hereinafter Called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth agree as follows: <br />g <br />y = <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />4. <br />generally described as follows: <br />The project will consist of the replacement of an existing culvert crossing Blue Cypress Lake Road <br />''• <br />located north of State Road 60 and east of the Florida's Turnpike. The proposed pipe to be constructed will <br />be :a 38"x6'0" Elliptical Reinforced Concrete Pipe (ERCP), with concrete end walls added to the.pipe ends. <br />Other work will include temporary canal bypass, temporary sheet pile, earthwork; pavement replacement, <br />`} <br />maintenance of traffic, erosion control and any other incidental work required to complete the project. <br />i <br />ARTICLE 2 -THE PROJECT <br />{ <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name, BLUE CYPRESS LAKE ROAD CULVERT REPLACEMENT <br />Bid Number:: 2018033 <br />Project Address:. Blue Cypress Lake Road, Vero Beach, Florida 32966 <br />ARTICLE 3 --"CONTRACT TIMES <br />3.01 .Time of :the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and' readiness forfinal <br />payment as stated in the specifications are of the essence of the Agreement: <br />3:02 Daysto Achieve Substantial Completion, final Campletion:and Final Payment' <br />A. The Work will be completed and ready for final payment on or before the 60th day after the date <br />when the. Contract Times commence to run. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER <br />will suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 <br />above, plus any extensions thereof allowed in writing as .a change order to this Agreement. <br />Liquidated damages will commence for this portion of work. The parties also recognize -the delays, <br />expense, and difficulties involved in proving in a legal proceedingthe actual loss.suffered byOWNER <br />F:\Purchas1ng\Bids\2o17-2018 H (2018000)\2018033 RFP for Blue Cypress Culvert Replacement\Agreement.docx <br />Page i of 11- - . . <br />