My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-038B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-038B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:47:22 PM
Creation date
3/15/2018 11:41:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2018
Control Number
2018-038B
Agenda Item Number
8.T.
Entity Name
Hinterland Group, Inc.
Subject
Culvert Replacement
Area
Blue Cypress Lake Road
Project Number
1748
Bid Number
2018033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3:02 Daysto Achieve Substantial Completion, final Campletion:and Final Payment' <br />A. The Work will be completed and ready for final payment on or before the 60th day after the date <br />when the. Contract Times commence to run. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER <br />will suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 <br />above, plus any extensions thereof allowed in writing as .a change order to this Agreement. <br />Liquidated damages will commence for this portion of work. The parties also recognize -the delays, <br />expense, and difficulties involved in proving in a legal proceedingthe actual loss.suffered byOWNER <br />F:\Purchas1ng\Bids\2o17-2018 H (2018000)\2018033 RFP for Blue Cypress Culvert Replacement\Agreement.docx <br />Page i of 11- - . . <br />Agreement <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY- a Political. Subdivision of the State of Florida <br />organized and existing under the Laws of the State of Florida, (hereinafter called OWNER) and Hinterland <br />Group, Inc. (hereinafter Called CONTRACTOR). OWNER and CONTRACTOR, in consideration of the mutual <br />covenants hereinafter set forth agree as follows: <br />g <br />y = <br />ARTICLE 1- WORK <br />CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work is <br />4. <br />generally described as follows: <br />The project will consist of the replacement of an existing culvert crossing Blue Cypress Lake Road <br />''• <br />located north of State Road 60 and east of the Florida's Turnpike. The proposed pipe to be constructed will <br />be :a 38"x6'0" Elliptical Reinforced Concrete Pipe (ERCP), with concrete end walls added to the.pipe ends. <br />Other work will include temporary canal bypass, temporary sheet pile, earthwork; pavement replacement, <br />`} <br />maintenance of traffic, erosion control and any other incidental work required to complete the project. <br />i <br />ARTICLE 2 -THE PROJECT <br />{ <br />The Project for which the Work under the Contract Documents may be the whole or only a part is generally <br />described as follows: <br />Project Name, BLUE CYPRESS LAKE ROAD CULVERT REPLACEMENT <br />Bid Number:: 2018033 <br />Project Address:. Blue Cypress Lake Road, Vero Beach, Florida 32966 <br />ARTICLE 3 --"CONTRACT TIMES <br />3.01 .Time of :the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and' readiness forfinal <br />payment as stated in the specifications are of the essence of the Agreement: <br />3:02 Daysto Achieve Substantial Completion, final Campletion:and Final Payment' <br />A. The Work will be completed and ready for final payment on or before the 60th day after the date <br />when the. Contract Times commence to run. <br />3.03 Liquidated Damages <br />A. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER <br />will suffer financial loss if the Work is not completed within the times specified in paragraph 3.02 <br />above, plus any extensions thereof allowed in writing as .a change order to this Agreement. <br />Liquidated damages will commence for this portion of work. The parties also recognize -the delays, <br />expense, and difficulties involved in proving in a legal proceedingthe actual loss.suffered byOWNER <br />F:\Purchas1ng\Bids\2o17-2018 H (2018000)\2018033 RFP for Blue Cypress Culvert Replacement\Agreement.docx <br />Page i of 11- - . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.