My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-038B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-038B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 12:47:22 PM
Creation date
3/15/2018 11:41:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/20/2018
Control Number
2018-038B
Agenda Item Number
8.T.
Entity Name
Hinterland Group, Inc.
Subject
Culvert Replacement
Area
Blue Cypress Lake Road
Project Number
1748
Bid Number
2018033
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Indian River County <br />Purchasing Division q <br />1800 27th Street <br />Vero Beach, FL 32960�'LORIpA <br />Phone (772) 226-1416 <br />ADDENDUM NO. 1 <br />Date: January 18, 2017 <br />Project Name: 74th Avenue SW and 1St Street SW Culvert Replacement <br />(IRC -1737) <br />Bid Number: 2018024 <br />Bid Opening Date: Wednesday, January 24, 2018 at 2:00 p.m. <br />This addendum is released to provide the minutes and sign in sheet from the Mandatory Pre -Solicitation Conference. <br />All information provided herein is hereby incorporated into the request for proposal documents. <br />1. Cost Proposals will NO longer be Lump Sum. Replace the Proposal Pricing Form on page 11 of the RFP with <br />the attached "Itemized Cost Proposal Form". <br />2. Request for payment for stored materials MUST be accompanied by a paid invoice. <br />3. Maintenance of Traffic Plan to be prepared by an, individual that is FDOT certified to prepare Maintenance <br />of Traffic Plans. At minimum, one (1) lane of traffic must be open at any given time with the appropriate <br />lane closure measures In place per FDOT Index 600 series. Two (2) lanes of traffic are expected to be opened <br />for the majority of the construction schedule. <br />4. The 120" steel pipe will meet the FDOT Spec 943 (8 gauge 5"x1" or 3"x1" corrugated). <br />5. Construction activities over Florida Gas Transmission line must adhere to Florida Gas Transmission standards <br />which can be received from Joseph Sanchez (407) 838-7171 or Russell Maclees (772) 216-7612. <br />Attachments: <br />Itemized Cost Proposal. <br />Pre -Solicitation Conference Minutes <br />Pre -Solicitation Conference Sign -In Sheet <br />IRFWCD Permit # 17-33 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1737 74th Ave and ist SW Culvert Replacement\1-Admin\Bid <br />Documents\Addendums\1737 Addendum_20180116 v2.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.