My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/23/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:23:06 PM
Creation date
3/16/2018 4:14:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/23/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENGINEERED TO LAST <br />Items not Included <br />• VFD's <br />0 Relays <br />• Installation <br />0 Spare Parts <br />• Field Wiring <br />0 Explosion Proof Motor <br />• Junction Boxes <br />0 Propeller <br />• Starters <br />Installation Brackets <br />• Hatches <br />Guide Pipe Assembly <br />• Conduits <br />0 Crane <br />• Control Panels <br />0 Startup <br />• Valves <br />• Any other device, equipment, materials <br />or labor not specifically called out in this <br />proposal. <br />Additional Information <br />• Our prices include duty and freight to Indian River County, FL. <br />• We do not collect and are not responsible for any sales and use taxes. If these taxes <br />are applicable, you are responsible for remitting them directly to your Department of <br />Revenue. <br />• Prices valid for 60 days from proposal date. <br />• Payment conditions will have to be defined at the time of the order. <br />■ Delivery: 6-8 weeks after receipt of purchase order. <br />• We are pleased to attach the following documents: <br />• Technical Data Sheet <br />• General Terms of Sales and Delivery <br />Storage and Handling Instructions <br />• If the mixer is to be stored prior to installation for a period longer than one month, <br />then on a monthly basis the propeller shaft must be turned in the direction of the <br />arrow at least three (3) complete revolutions. This ensures that the internal seals will <br />be lubricated, thus preventing any oil leakage. It may be necessary to open the crate <br />in order to turn the shaft. <br />• If possible, the mixer must be stored indoors. If indoor storage is not available, cover <br />the mixer with a tarp to protect the mixer from direct sunlight. Proper storage <br />practices will help to ensure successful operation of the mixes upon installation. <br />• Upon installation, the mixer must be operated at least once every two months. <br />Landia, Inc. — Project No. 21908 A06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.