Laserfiche WebLink
Indian River County Department of Utilities <br />CONSTRUCTION BUDGET - Labor Contract & Direct Purchase <br />Project: 128th Court Water Main Extension <br />By: John M. Boyer, P.E. <br />Date: January 8, 2018 <br />Extend 6" water main from Roseland Road. <br />LABOR COSTS <br />MATERIAL COSTS <br />(IRC Direct Purchase) <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Labor Unit <br />Price <br />Total Labor <br />Price <br />Material Unit <br />Price <br />Total Material <br />Price <br />01c <br />Install 6" PVC Water Main <br />1,064 <br />LF <br />$6.00 <br />$6,384.00 <br />$3.90 <br />$4,149.60 <br />02C <br />Install 6" DIP Water Main <br />144 <br />LF <br />$9.00 <br />$1,296.00 <br />$6.00 <br />$864.00 <br />9 <br />Install MJ Fittings <br />1.00 <br />ton <br />$4,100.00 <br />$4,100.00 <br />$4,100.00 <br />$4,100.00 <br />16b <br />Install Stainless Steel Wet Tap Assembly w/ gate valve - <br />(run 10"-16" &branch 4"-8"} and Tap Main <br />1 <br />EA <br />$1,400.00 <br />$1,400.00 <br />$940.00 <br />$940.00 <br />18g <br />Install Water Service -Single Long with 3/4x5/8" meter <br />and box (more than 50 ft) <br />6 <br />EA <br />$425.00 <br />$2,550.00 <br />$550.50 <br />$3,303.00 <br />181 <br />Install Water Service -Double Long with 3/4x5/8" meter <br />and box (more than 50 ft) <br />2 <br />EA <br />$425.00 <br />$850.00 <br />$1,169.70 <br />$2,339.40 <br />181 <br />Install 2' PVC Service Casing <br />1 <br />EA <br />$400.00 <br />$400.00 <br />$40.00 <br />$40.00 <br />18m <br />Install 3" PVC Service Casing <br />2 <br />EA <br />$600.00 <br />$1,200.00 <br />$60.00 <br />$120.00 <br />19b <br />Install 6" NRS Resilient Seated Gate Valve or Butterfly <br />Valve <br />4 <br />EA <br />$125.00 <br />$500.00 <br />$405.00 <br />$1,620.00 <br />20b <br />Install New Fire Hydrant Assembly w/ 6" tapping valve <br />& sleeve <br />1 <br />EA <br />$2,000.00 <br />$2,000.00 <br />$2,055.00 <br />$2,055.00 <br />23 <br />Test Holes / Potholes <br />10 <br />EA <br />$250.00 <br />$2,500.00 <br />N/C <br />$0.00 <br />23 <br />Install 2" Blow -off <br />1 <br />EA <br />$400.00 <br />$400.00 <br />$537.50 <br />$537.50 <br />28 <br />Install Temporary Jumper <br />1 <br />EA <br />$500.00 <br />$500.00 <br />N/C <br />$0.00 <br />29b <br />Fill, Pressure Test, Chlorinate, & Flush WM <br />1,208 <br />LF <br />$1.50 <br />$1,812.00 <br />0.00 <br />$0.00 <br />30b <br />Install & Remove Sample Point <br />4 <br />EA <br />$275.00 <br />$1,100.00 <br />$215.00 <br />$860.00 <br />30c <br />Take & Test Bacteriological Sample <br />8 <br />EA <br />$150.00 <br />$1,200.00 <br />$0.00 <br />$0.00 <br />86a <br />Lawn Restoration (Topsoil & Sod) Includes Watering <br />1,182 <br />SY <br />$2.25 <br />$2,660.00 <br />$2.15 <br />$2,541.78 <br />91 <br />Mobilization, Demobilization, MOT (based on 10% Labor <br />Cost): <br />1 <br />LS <br />$3,085.20 <br />$3,085.20 <br />$0.00 <br />$0.00 <br />Subtotals: <br />Labor: <br />$33,937.20 <br />Material: <br />$23,470.28 <br />Contingency: <br />5% <br />$1,696.86 <br />5% <br />$1,173.53 <br />Labor: <br />$35,634.06 <br />Material: <br />$24,643.79 <br />TOTAL CONSTRUCTION COST: <br />$60,277.85 <br />FDEP PERMIT FEE: <br />$650.00 <br />Survey & Stake -Out (budget): <br />$2,520.00 <br />Eng. Design (by Staff): <br />$0.00 <br />As -Built Survey (budget): <br />$2,520.00 <br />ESTIMATED CONSTRUCTION <br />BUDGET: <br />$65,967.85 <br />LI <br />F Ub ksUTILITY - EngineennglProjects - utility Construction Pemits%IRC - 128th CT Water Main UCP 4142VldminlCost EslimatelCosl Estimate - 129 Court -Powers <br />