My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/23/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/23/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:23:06 PM
Creation date
3/16/2018 4:14:43 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/23/2018
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK ORDER NUMBER #10 <br />Jones Pier Phase 1 Wetland Restoration Design <br />This Work Order Number 10 is entered into as of this _ day of 2018, pursuant to that <br />certain Continuing Contract Agreement for Professional Services, dated November 15, 2011, and that <br />certain Extension and Amendment of Continuing Contract Agreement for Professional Services entered into <br />as of the 4w day of November, 2014 (collectively referred to as the "Agreement"), by and between INDIAN <br />RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and MBV Engineering, Inc. <br />("Consultant"). <br />SCOPE OF WORK <br />It is our understanding that the COUNTY intends to do a wetland restoration design at the existing <br />Jones Pier site located at 7770 Jungle Trail, Vero Beach, FL 32963. <br />The proposed design improvements will consist of wetland restoration design plans that will <br />incorporate a master wetland/wet pond system for the parcel. This improvement will require design <br />services and coordination with the IRC Parks Division staff. It is understood and assumed that the <br />existing conditions survey will be adequate for use in the plans development for this project. As <br />such, MBV Engineering, Inc. will provide the design, exhibit plans, plan details, cost estimates and <br />fill analysis as related to this Phase of the project. A description for each service is provided in below <br />in further detail. <br />Design Services <br />a. Construction Plans <br />The Consultant will prepare 24" x 36" design drawings for the above described <br />improvements in accordance with directions from the Parks Division staff. The design <br />drawings for the Jones Pier Phase 1 Wetland Restoration improvements will include <br />existing conditions plan, Wetland Restoration plan(s), Conceptual Wet Pond design <br />plan, Wetland and plantings Details as provided to Consultant by Parks Division staff, <br />erosion control plan and applicable details plans. Consultant will also provide cut / <br />fill analysis associated with the wet pond and provide assumptions on estimated fill <br />volumes for portions of the overall parcel to be utilized pursuant to COUNTY Parks <br />Division expectations. <br />b. County Reviews <br />The Consultant will coordinate with the COUNTY Parks Division staff during design <br />development for this Phase. COUNTY Parks Division staff shall provide review <br />comments to Consultant and their respective wetland and planting details <br />information in order for Consultant to be able to incorporate into the design plans <br />package. <br />
The URL can be used to link to this page
Your browser does not support the video tag.