My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I . Providing applicant the option of submitting an approved traffic methodology rather than a <br />traffic study, concurrency certificate, or concurrency application at the time of preliminary plat <br />application. <br />2. Adding 7 days more staff review time prior to TRC. <br />3. Requiring staff to conduct a pre-TRC inter-departmental coordination meeting. <br />4. Requiring staff to send draft TRC comments to the applicant prior to TRC. <br />5. Requiring staff to indicate code/safety/engineering-required comments and advisory <br />comments. <br />6. Requiring final TRC comments to consist of draft comments and items discussed at TRC. <br />7. Requiring applicant responses to recite each staff comment and indicate where a change has <br />been made on the revised preliminary plat. <br />8. Requiring submission of a traffic study and concurrency application prior to or at the time of <br />the post-TRC resubmittal. <br />9. Authorizing staff level approval for preliminary plats proposing less than 25 residential lots or <br />units. (Note: the 25 lot/unit threshold is consistent with the small project threshold used in <br />other regulations such as the Chapter 918 sewer connection requirements.) <br />Effective date: Because the application review scheduling and routing process will change, a <br />delayed effective date is needed for staff training and notification to potential applicants. As <br />proposed, the effective date will be May 1, 2018. <br />Chapter 914 (Site Plans) "Ordinance #3" <br />Changes proposed for site plans reflect the same changes described above for preliminary plats, <br />and also include an updated reference to the new traffic study threshold. <br />Effective date: For the same reasons relating to Chapter 913 changes, the proposed effective date <br />will be May 1, 2018. <br />Chapter 952 (Traffic) "Ordinance #4" <br />Changes proposed reflect traffic study threshold and traffic study review process adjustments, <br />and are summarized as follows: <br />1. Providing for the new traffic study submittal threshold. <br />2. Providing the option for the Public Works Director to approve conducting a traffic <br />methodology pre-application conference by telephone. <br />3. Requiring the methodology meeting to be held within 5 business days of the request for the <br />meeting made in writing or via email. <br />4. Requiring the applicant's engineer to provide a site access plan 3 days prior to the methodology <br />meeting. <br />5. Clarifying that the approved traffic methodology will be signed and dated by staff. <br />6. Requiring approval of the traffic methodology prior to formal site plan or preliminary plat <br />application submittal. <br />7. Requiring traffic study submittal prior to or at the time of the post-TRC resubmittal. <br />8. Providing review timeframes for traffic study submittals. <br />9. Updating the traffic methodology submittal requirements. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@780D49CO\@BCL@780D49CO.docx 109 <br />
The URL can be used to link to this page
Your browser does not support the video tag.