My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2018- <br />1. An initial or conditional concurrency certificates or evidence of application for <br />a certificate or a copy of the approved traffic methodology for the <br />development proiect. <br />The community development director or his designee shall determine whether or <br />not an application is complete and can be routed for interdepartmental review. No <br />incomplete application shall be routed for review. The applicant shall be notified as <br />soon as an incomplete determination has been made. <br />SECTION #2: <br />Amend LDR Section 913.07 (4)(F), "Reviews"; as follows: <br />(F) Reviews. <br />Technical review committee review <br />a. Within three (3) working days of a preliminary plat application the <br />community development department shall make an application <br />completeness determination and shall contact the applicant if the submittal <br />is determined to be incomplete. The Within three (3) working days of a <br />determination of completeness, the community development department will <br />forward one copy of the proposed preliminary plat to each of the county <br />divisions or other interested agencies within th ee (3)working : <br />g ��i g a uofthe initial <br />u <br />s bmit4a of the p ..,., <br />el':r., y plat for their review and written comments or <br />.�u «a <br />approval. <br />b. Within eleven (11) -eighteen (18) days after the receipt of the routing of the <br />preliminary plat and prior to the date the ph ti ha ' a to b <br />eensidefed at a T -RG meeting, T -RG membefs shall submit to the planning <br />division wr-iaen staff �- <br />approvals or- the ident•t of a• Nu i«TRC <br />J cam <br />meeting date at which the application is scheduled to be considered, each <br />TRC member shall review the application and submit written comments to <br />the planning division. Prior to each TRC meeting, the planning division <br />shall conduct an inter -departmental staff coordination meeting to <br />coordinate draft comments and transmit post -coordination meeting draft <br />comments to the applicant by email or similar medium prior to the TRC <br />meeting. - <br />c. At a technical review committee (TRC) meeting, the discrepancy comments will <br />be reviewed. <br />d. The community development department shall, within four (4) working days <br />from the TRC meeting, transmit a comment letter to the applicant or his <br />engineer identifying all of the discrepancies pertaining to the preliminary plat <br />that were discussed at the TRC meeting. Each comment shall either indicate <br />that the comment involves a code, safety, or engineering requirement or <br />that the comment is advisory. Comments shall consist of the draft <br />comments and items discussed at the TRC meeting. <br />Bold Underline: Additions to Ordinance <br />Sk44i@ through, Deleted Text from Existing Ordinance <br />F:\Community Development\CurDev\Ordinances\20180rdinances\2018- 913.07(4)(A) and (F) - Preliminary Plat application and <br />review.docx <br />2 <br />123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.