My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2018 - <br />Three (3) copies of the completed traffic impact study shall be submitted to the <br />Indian River County Pttb ie `x elks Community Development Department ftftd <br />one (,eep� tet, submitted <br />it �v to the :+ ao of „t .4 *as <br />part of the seeera TncrrRG. submicrai-post-TRC resubmittal to the Community <br />Development Department. Failure to submit a traffic impact study will <br />result in the resubmittal being placed on hold until a traffic impact study <br />is submitted. <br />2. The format of the traffic impact study shall follow the otitline report format <br />identified in subsection 952.07(7), Format of Traffic Impact Study. <br />3. The traffic impact study shall include a concurrency determination network <br />form annotated with each impacted segment's average annual daily project <br />traffic and peak hour, peak direction, peak season project traffic volumes. <br />4. The traffic impact study shall include a concurrency determination network map <br />illustrating each impacted segment's average annual daily project traffic and <br />peak hour, peak direction and peak season project traffic volumes and <br />associated levels of service. <br />The traffic impact study shall be prepared under the responsible supervision and <br />direction of, and be signed and sealed by a Florida -registered professional <br />engineer whose area of practice is transportation engineering. <br />6. The traffic impact study shall be reviewed in the same time frame allotted <br />to the project development plan review process, County Traffic <br />Engineering comments shall be provided to the engineer of record as part <br />of the staff comment response letter provided by the Community <br />Development Department to the applicant. <br />.............1 -111111 MENgees;*sse�ss�s!eer!�er�sr�s�s:�r�!�ss�srs�!���i�7�ee!�s!�:�er.�s <br />(e� The following pFeeeduFe shall be followed if the dir-eetor- of publiewor-ks detelzmifle <br />(€c) The appeals process for a traffic impact study shall be governed by the procedure <br />set forth in section 910. 11, Appeals Process and Vested Rights Determination. <br />(gd) Site access €efa-proposed in a traffic impact study shall be consistent with the <br />requirements identified in section 952.12, Access Control. The applicant or his <br />engineer is required to provide a site access plan at3 days prior to the traffic study <br />Bold Underline: Additions to Ordinance <br />Deleted Text from Existing Ordinance <br />F:\Community Development\CurDev\Ordinances\20180rdinances\2018- 952.07 - Traffic Impact Study.docx <br />135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.