My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br />APPROVED PRODUCTS <br />Fire Hydrants 5 %" Valve Opening <br />Add East Jordon Iron Works Fire Hydrants. Ease of maintenance and a local distributer. <br />Three manufacturers on the list, including Mueller & Clow. <br />PE Pipe and Tubing <br />Remove Endot poly. Product has not performed well. Add REHAU Municipex poly, which is a <br />crosslinked polyethylene PEXa. Has tested extremely well. Two local distributers. Five PE <br />manufacturers on the list. <br />Bronze Gate Valves <br />Add EJ Gate Valves. They appear to be a much heavier built valve. <br />Manhole and Lift Station Linings <br />Remove Con Shield Technologies, Inc. Four manufacturers remain on the list. <br />Manhole -Pipe Connection (Boot) <br />Add PBX Press Seal Gasket Corp. Two manufacturers on the list. <br />Meter Boxes <br />Add Glassmeter Pre -Plumbed Meter Boxes, Hubbell Meter Boxes. Three manufacturers on the <br />list. <br />Lift Station and Manhole Sealant Coatings <br />Add CANUSA WRAPID SEAL. Two manufacturers on the list. <br />UTILITY CONSTRUCTION PERMIT CHECKLIST <br />POTABLE WATER DISTRIBUTION SYSTEM <br />5. Removed requirement for record of amount of water used during construction. Added <br />compaction density report to be signed by Florida PE. <br />9. Added new text for Backflow Preventer Certification(s). Proof required that certification <br />has been filed in accordance with the County Cross Connection Control Program. <br />WASTEWATER COLLECTION/TRANSMISSION SYSTEM <br />5. Added compaction density report to be signed by Engineer of Record. <br />DRAWINGS <br />W-1 FIRE HYDRANT VALVES: Add Note 8, No reflective markers shall be placed in bike lanes. <br />W-2 FIRE HYDRANT DETAILS: Note 10, Remove reference to fire code. IRCDUS requires a <br />greater clear zone. <br />W-3 MANUAL 2" BLOW OFF: Removed 2" downturn section from drawing. Removed Note side <br />regarding IRCDUS constructing and removing downturn section. <br />161 <br />
The URL can be used to link to this page
Your browser does not support the video tag.