My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/2018
CBCC
>
Meetings
>
2010's
>
2018
>
03/13/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:55:33 PM
Creation date
3/21/2018 2:30:08 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River COUNTY 45th Street Milling & Resurfacing Project <br />02/2112018 IRC -1722 (FDOT SCOP FM No. 436848-1) <br />Page 2 of 11 MM File #1804 <br />Utility adjustments to existing Indian River County Utilities water & sewer services are expected and will be <br />part of this project. <br />It is understood the CONSULTANT will use one of the COUNTY's approved continuing service contract <br />geotechnical consultants to perform a geotechnical investigation for this project to be used by CONSULTANT <br />for this project. CONSULTANT shall coordinate with the geotechnical consultant and COUNTY to establish <br />geotechnical scope of services. COUNTY shall pay the geotechnical consultant directly subject to <br />CONSULTANT acceptance of the geotechnical services. <br />In addition, the COUNTY agrees to provide (in a timely manner) the following material, data, or services as <br />required in connection with the work to be performed under this Agreement; all of which information the <br />CONSULTANT may use and reasonably rely upon: <br />A. Provide the CONSULTANT with traffic counts, preliminary data or reports available, existing location <br />surveys, past topographic survey information, and related documents required to complete the <br />construction documents. <br />B. Provide the CONSULTANT with all available drawings, right-of-way maps, and other documents in the <br />possession of the COUNTY pertinent to the project. <br />C. The COUNTY will promptly execute all permit applications necessary to expedite the acquisition of <br />any local, state or federal permits made necessary by the project. <br />D. The COUNTY will reimburse CONSULTANT for all permit fees in an effort to expedite permit <br />application submittals. <br />The PROJECT LIMITS are projected to extend 6,700 feet along 451h Street, 600 feet along 581h Avenue, and <br />600 feet along 43`d Avenue for a total project length of 7,900 feet (1.50 miles). <br />SECTION II - SCOPE OF SERVICES <br />As agreed upon between ENGINEER and the COUNTY, the ENGINEER shall provide Professional Engineering <br />services to complete all tasks as outlined above as follows: <br />A. Route Survey: As the land surveying provided by the COUNTY was performed in 2008 and is out of date, <br />a new updated survey of the project limits shall be performed by our land surveying affiliate, Masteller, <br />Moler & Taylor, Inc. (MMT). The survey shall be completed on NAVD '88 datum. <br />B. Roadway Improvement Construction Plans: <br />Roadway set of plans shall consist of the following: <br />Construction Plan Sheets (11" x 17" Size) <br />30% 60% <br />90% <br />100% <br />Cover Sheet <br />P C <br />C <br />F <br />Summary of Pay Items <br />- P <br />C <br />F <br />Typical Sections <br />C C <br />C <br />F <br />(2) <br />HMM <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.