My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-035
CBCC
>
Resolutions
>
2010's
>
2018
>
2018-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:44:12 PM
Creation date
3/27/2018 11:41:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2018-035
Approved Date
03/20/2018
Agenda Item Number
10.A.2. & 10.A.3.
Resolution Type
Amendment
Entity Name
Comprehensive Plan Text Amendments
Subject
Sanitary Sewer Sub-Element for Septic to Sewer Conversion
Coastal Management Element for Sea Level Rise
Future Land Use Element
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Sewer Service Area <br />The Central Regional Sewer Service Area includes the portion of the mainland generally <br />bounded by I-95 on the west, 69th Street on the north, the Indian River Lagoon on the east, and <br />the City of Vero Beach and 26th Street on the south. This plant located north of 49th Street, in the <br />unincorporated community of Gifford. The Central Regional Wastewater Treatment Facility <br />(WWTF) is located within the service area. <br />This plant, with a 4,000,000 GPD capacity, uses contact stabilization and extended aeration to <br />provide a tertiary filtration level of treatment. Presently, effluent from the treatment facility is <br />discharged into percolation ponds or reused for spray irrigation. <br />Collection lines extend from the plant along 49th Street, between 58`d Avenue and US 1, along <br />58th Avenue from 26th Street to 65th Street, along 53`d Street from 58th Avenue to the Lateral H <br />canal and along US 1 from 69th street to Indian River Memorial Hospital. The system also <br />extends to the Bent Pine and Grand Harbor residential developments, and to much of the Gifford <br />community. <br />The Central Regional WWTF is presently accepting flow from the North Regional Wastewater <br />Treatment Facility, which is temporarily on stand-by. The flow is being transferred from the <br />north facility to the central facility via a 16" transmission force main located along Old Dixie <br />Highway from 77th Street to 53`d Street, then into the Central Regional WWTF along the Lateral <br />H canal. <br />Central Re ional Plant <br />Public or Private <br />Public <br />Operating Entity <br />Indian River County <br />Geographic service area <br />Vero Beach City Limits to 69th St. <br />Design capacity in GPD <br />4,000,000 <br />Current demand in GPD 2017834,000 <br />2,253,000 <br />Level of Service <br />250 GPD/ERU <br />Projected facility needs <br />4,250,000 al./da 2030 <br />Effluent Disposal Method <br />Reuse Irrigation/Rib Basin <br />Effluent Disposal Site <br />Various Golf Courses <br />Level of Treatment <br />Tertiary Treatment <br />Treatment Method <br />Contact Stabilization/Extended Aeration <br />Screenings/Grit Disposal Site <br />Landfill <br />Sludge and Se to a Disposal Site <br />Sludge Facility at landfill <br />Community Development Department Indian River County <br />12 Appendix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.