My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-035
CBCC
>
Resolutions
>
2010's
>
2018
>
2018-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:44:12 PM
Creation date
3/27/2018 11:41:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2018-035
Approved Date
03/20/2018
Agenda Item Number
10.A.2. & 10.A.3.
Resolution Type
Amendment
Entity Name
Comprehensive Plan Text Amendments
Subject
Sanitary Sewer Sub-Element for Septic to Sewer Conversion
Coastal Management Element for Sea Level Rise
Future Land Use Element
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Vero Beach Sewer Service Area <br />The City of Vero Beach sewer service territory encompasses the City of Vero Beach, most of the <br />Town of Indian River Shores (one multiple -family residential complex is excluded), and the <br />portion of the barrier island south of the City of Vero Beach. In addition, it serves some of the <br />unincorporated county area around the city. <br />The Vero Beach Wastewater Treatment Plant has a design capacity of 4,500,000 GPD. The <br />method of treatment consists of complete mix activated sludge, followed by water reclamation <br />processes that include tertiary filtration and high level disinfection. Most effluent from this plant <br />is used for irrigation by golf courses and residential developments. Dth-ing and immediately <br />after- per-iods ef e*tfemely high miaWl, however-, seme effluent is disehar-ged into the indi <br />tease The remainder is disposed of via deep injection well. <br />City of Vero Beach Plant <br />Public or Private <br />Public <br />Operating Entity <br />City of Vero Beach <br />Geographic service area <br />City of Vero Beach; Town of Indian River <br />Shores; South Barrier Island <br />Design capacity in GPD <br />4,500,000 <br />Current demand in GPD 2QI 71 <br />3,500,7000 <br />Level of Service <br />250 GPD/ERU <br />Projected facility needs <br />4,000,000 al./da 2030 <br />Effluent Disposal Method <br />Reuse/ Deep <br />Injection Well <br />Effluent Disposal Site <br />Residential Landscapes/Golf Courses <br />Level of Treatment <br />Secondary/High Level Disinfection <br />Treatment Method <br />Activated Sludge/Filtration <br />Screenings/Grit Disposal Site <br />Landfill <br />Sludge and Se to a Disposal Site <br />IT <br />Table 3.A.2 summarizes the county regional wastewater treatment system. <br />Community Development Department <br />14 <br />Indian River County <br />Appendix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.