My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-035
CBCC
>
Resolutions
>
2010's
>
2018
>
2018-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:44:12 PM
Creation date
3/27/2018 11:41:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2018-035
Approved Date
03/20/2018
Agenda Item Number
10.A.2. & 10.A.3.
Resolution Type
Amendment
Entity Name
Comprehensive Plan Text Amendments
Subject
Sanitary Sewer Sub-Element for Septic to Sewer Conversion
Coastal Management Element for Sea Level Rise
Future Land Use Element
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Sanitary Sewer Sub -Element <br />residents as well as industrial and business establishments anticipated in future years. The <br />remaining capital cost is recouped through monthly charges. <br />As a payment option for extension of the sewer collection system, the county allows a <br />contribution in aid of construction. After the installation of sewage collection facilities by a <br />developer, title to those facilities is transferred to the county. The referenced facilities may be <br />"on-site" or "off-site." These options are discussed below. <br />• On -Site Facilities <br />Each developer is responsible for the design, installation, inspection, and testing of the complete <br />sewage collection system located within the boundaries of the developer's property. <br />• Off-site Facilities <br />The location, size or proposed density or intensity of a development project may make service to <br />the property dependent upon the extension of off-site sewage collection facilities. Off-site <br />facilities are those mains, sewage collection lines, sewage force mains, and/or pumping stations <br />adequate in size to transmit sewage collected on the developer's property to a treatment plant or <br />disposal site. <br />The county's policy is to expand its sewer system in an orderly and economical manner. That <br />expansion schedule, however, does not always coincide with a developer's plans. In cases where <br />the county does not plan to expand its system to serve a project in the timeframe required by a <br />developer, the developer is required to construct or pay the cost of off-site facilities associated <br />with that project when the following conditions exist: <br />• such an extension would require an extraordinary expenditure by the county for <br />transmission facilities; and <br />• such expenditure would cost more than the county's standard capacity charge. <br />In that event, the county may negotiate an agreement which enumerates the following: <br />• the county's responsibility to provide service to the development and possibly <br />reimburse the developer for oversized facilities; and <br />• the developer's responsibility to construct and dedicate to the county the off-site <br />facilities (possibly oversized to meet future demands). <br />Community Development Department <br />Indian River County 17 <br />Appendix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.