My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-035
CBCC
>
Resolutions
>
2010's
>
2018
>
2018-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:44:12 PM
Creation date
3/27/2018 11:41:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2018-035
Approved Date
03/20/2018
Agenda Item Number
10.A.2. & 10.A.3.
Resolution Type
Amendment
Entity Name
Comprehensive Plan Text Amendments
Subject
Sanitary Sewer Sub-Element for Septic to Sewer Conversion
Coastal Management Element for Sea Level Rise
Future Land Use Element
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Sanitary Sewer Sub -Element <br />Figure 3.A.2 WWTF Capacity vs. Demand <br />W WTF Capacity vs. Demand <br />20.00 -------. - <br />--- 19.00 -_-.. _ 1900 <br />18.00 - - --- --- <br />16.00 16.00 <br />14.00 14.00 <br />14.00 <br />12.85 12.85 <br />0 12.62 <br />� 12.00 -----------. _ ..._-------- <br />11.60 <br />1000 - 0.§2 <br />8.65 67 60 <br />m8.00 8' -"--- <br />v 6.00 5.72 7 <br />6.00 ------- <br />4.91 0 <br />4.00 <br />3.89 <br />2.00 <br />0.00 <br />2000 2005 2010 2015 2020 2025 2030 <br />2035 <br />—O%eral WWfF Capacity <br />— Demand with Corcurency <br />+ Demand W/O Concurew <br />To ensure sufficient capacity through 2030, the county should take the following steps: <br />• Begin planning and preliminary design for expansion when a plant's Average Daily <br />Demand is projected to equal or exceed its capacity within 5 years; <br />• Prepare plans and specifications for expansion when a plant's Average Daily Demand <br />is projected to equal or exceed its capacity within 4 years; <br />• Submit a complete construction permit application to the Florida Department of <br />Environmental Protection (DEP) for expansion when a plant's Average Daily <br />Demand is projected to equal or exceed its capacity within 3 years; and <br />• Submit an application for an operation permit for the expanded facility to DEP when <br />a plant's Average Daily Demand is projected to equal or exceed its capacity within 6 <br />months. <br />Taking these steps within the referenced timeframes will ensure that the county has sufficient <br />time to design, permit, and construct needed plant capacity. At the same time, these timeframes <br />decrease the chances that plants will have many years of unused capacity. <br />A list of sanitary sewer capital improvements is provided in the Capital Improvements Element <br />(CIE) of the county's comprehensive plan . <br />Since the county's CIE must be updated annually, projects completed will be dropped from the <br />list of capital improvements and new projects will be added as needed. <br />Community Development Department <br />Indian River County 17 <br />Appendix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.