My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-035
CBCC
>
Resolutions
>
2010's
>
2018
>
2018-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:44:12 PM
Creation date
3/27/2018 11:41:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2018-035
Approved Date
03/20/2018
Agenda Item Number
10.A.2. & 10.A.3.
Resolution Type
Amendment
Entity Name
Comprehensive Plan Text Amendments
Subject
Sanitary Sewer Sub-Element for Septic to Sewer Conversion
Coastal Management Element for Sea Level Rise
Future Land Use Element
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan <br />Sanitary Sewer Sub -Element <br />POLICY 7.2: The county shall ensure that, prior to the issuance of development orders <br />or permits for projects to be served by septic tank systems, the applicant has <br />demonstrated that the project complies with Florida Department of Health (DOH) <br />regulations Section 381.0065 FS -and RAr Chapter 64E-6, FAC, permit requirements for <br />septic tank -systems. <br />POLICY 7.3: The county in coordination with and through the DOH -Indian River, shall <br />require that issuance of permits for repair or replacement of existing septic tank—systems <br />be conditioned upon compliance with the most updated vefien of DEP --egul tefy <br />andFederalandStatewatef quality standards as identified in the <br />"Regulated ewe eetien of the -Sub element. with DOH regulations Section <br />381.0065 FS and Chapter 64E-6, FAC, permit requirements for septic systems. <br />POLICY 7.4: The county, in coordination with and through the 1RC14DDOH-Indian <br />River, shall establish public education programs on the proper use, inspection <br />requirements, maintenance, and abandonment of septic tanks sy tems. The tis tic <br />system abandonment process shall be based on current state and local regulations. <br />POLICY 7.5: Consistent with Section 381.00651 FS and in coordination with and <br />through the DOH -Indian River, the County shall encourage a volun!M opt --in provision <br />for septic system maintenance and encourage contractors that provide septic maintenance <br />to document information. <br />POLICY 7.6: The County, in coordination with and through the DOH -Indian River, shall <br />encourage all septic systems including repairs and modifications to meet a 24 inch <br />separation between the bottom of the drainfield and the wet season water table and meet <br />75 foot setbacks from surface waterbodies and wells. <br />Appendix A <br />Community Development Department Indian River County 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.