My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-035
CBCC
>
Resolutions
>
2010's
>
2018
>
2018-035
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2018 3:44:12 PM
Creation date
3/27/2018 11:41:25 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
2018-035
Approved Date
03/20/2018
Agenda Item Number
10.A.2. & 10.A.3.
Resolution Type
Amendment
Entity Name
Comprehensive Plan Text Amendments
Subject
Sanitary Sewer Sub-Element for Septic to Sewer Conversion
Coastal Management Element for Sea Level Rise
Future Land Use Element
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water transportation is provided on the Intracoastal Waterway in the Indian River Lagoon. This <br />federally maintained water route traverses the length of the county. The nearest deepwater ports <br />are located at Ft. Pierce to the south and Port Canaveral to the north. <br />In Indian River County, rail service is provided by the Florida East Coast Railroad (FEC). The <br />FEC maintains single and double tracks just west of and parallel to US 1. The nearest FEC <br />freight yard is in Ft. Pierce. <br />Aviation, Ports, and Rail issues are also discussed in the Transportation Element. <br />Sanitary Sewer <br />Generally, wastewater is a service that has traditionally been supplied by local government. In <br />addition to the more technologically sophisticated and efficient central systems, traditional <br />methods of wastewater treatment, including septie--1--eptic systems, are still employed in <br />Indian River County. <br />The primary purpose of wastewater treatment is to remove solids and toxic chemicals from <br />wastewater and render organic wastes inert. After treatment, the resulting water product is then <br />reintroduced into the natural water cycle. <br />Presently, there are five publicly operated regional wastewater treatment plants operating in the <br />county. Four of those plants are operated by the Indian River County Utilities Department, while <br />the other plant is operated by the City of Vero Beach. There are also three privately -operated <br />package treatment plants in the county. <br />While the county operated plants provide a level of service of 250 gallons/residential unit/day, <br />the city operated plant provides a level of service of 197 gallons/residential unit/day. The <br />combined design capacity of the regional plants is 13,370,000 17.350,000 gallons/day, an <br />amount sufficient to accommodate their combined average daily demand of-&,�4,A8 8,780,000 <br />gallons/day. <br />Currently, the service area of the regional system includes substantial portions of the urban area <br />of the county. As such, wastewater lines extend to much of the county's urban area, including <br />portions of all three of the commercial/industrial nodes along I-95. In 2006, the county utilities <br />department had -244,38 28,167 sanitary sewer customers. <br />With respect to septie-ta-Aksentisystems, the Department of Health in Indian River County <br />(DOH -Indian River)Ptiblie Health Unit, <br />rteiyisien e f Envi_,.....,.,.ntal Health currently estimates <br />that there are app�more than 36,039 septic 4aakse tp is systems in use in Indian River <br />County. While approximately '� 121 new septie-walEseatic systems were installed in 20916 <br />in the county, that number has decreased significantly in more recent years as the level of <br />residential construction has declined. <br />Future Land Use Element 63 <br />Appendix A <br />
The URL can be used to link to this page
Your browser does not support the video tag.