Laserfiche WebLink
ATTACHMENT A <br />68th Avenue Resurfacing/Reclamation <br />From 26th St to 49th St <br />Indian River County, Florida <br />ESTIMATED SCOPE & BUDGET <br />Field Observations & Testing <br />Description <br />Total Units <br />Type <br />Rate <br />Extended Cost <br />, <br />In -Place Density Testing, FDR (1 test/500 ft eac ane <br />'4 test minimum per visit <br />100 <br />Test <br />$24.00 <br />= $2,400.00 <br />z <br />In -Place Density Testing, FDR Shoulder (1 test/2,000 ft) <br />'4 test minimum per visit <br />12 <br />Test <br />$24.00 <br />= $288.00 <br />In -Place Density Testing, Stab. Should (1 test/2,000 ft) <br />'4 test minimum per visit <br />12 <br />Test <br />$24,00 <br />= $288.00 <br />4 <br />In -Place Density Testing, Pipe Backfill (1 test/6-in lift per <br />section placed) <br />`4 test minimum pervisit <br />45 <br />Test <br />. <br />$25.00 <br />= $1,125.00 <br />5 <br />Sr. Eng. Technician, Sampling (18 trips @ 4 hrs/trip) <br />72 <br />Hours <br />$60.00 <br />= $4,320.00 <br />Sub -Total <br />$8,421.00 <br />Laboratory <br />Testing <br />Description <br />Total Units <br />Type <br />Rate <br />Extended Cost <br />Proctor Test, FDR (T-180)' <br />1/1,000 ft of each lane <br />24 <br />Each <br />$90.00 <br />= $2,160.00 <br />z <br />Proctor Test, Embankment/Pipe Backfill (T-99) <br />(1lSoil Type) <br />2 <br />Each <br />$90.00 <br />= $180.00 <br />s <br />Limerock Bearing Ratio Test (FM 5-515) <br />1/4,000 ft of Shoulder) <br />6 <br />Each <br />. <br />$300.00 <br />= $1,800.00 <br />Material Finer than the No. 200 Sieve <br />30 <br />Each <br />. <br />$40.00 <br />= $1,200.00 <br />4 <br />Sieve Analysis T-27 <br />30 <br />Each <br />$70,00 <br />= $2,100.00 <br />`The Proctor test for the FDR involves laboratory density determination of the field -prepared FDR mixture with <br />emulsions <br />Sub -Total <br />$7,440.00 <br />Asphalt Observations Uesting <br />escnp on <br />Total Units I <br />Type <br />Rate <br />Extended Cost <br />1 FDOT CTQP Certified Plant Inspector 12 da <br />120 <br />Hour <br />$60.00 = $7,200.00 <br />z Trip Charge to Asphalt Plant from Office <br />12 <br />Tri . <br />$35.00 = $420.00 <br />4 <br />Sub -Total <br />$7,620.00 <br />Engineering & Repotting Services <br />escnp on <br />Total Units I <br />Type <br />Rate <br />I Extended Cost <br />1 Principal Engineer <br />15 <br />Hour . <br />$175.00 = $2,625.00 <br />z Project Manager/Engineer <br />30 <br />Hour . <br />$95.00 = $2,850.00 <br />a Clerical/Adminstration <br />0 <br />Hour <br />$50.00 <br />4 <br />Sub -Total <br />$5,475.00 <br />Field servations & MaterialTesting Services <br />Subtotal of Materials Testing Services <br />Total <br />$28,956.00 <br />z <br />- $0.00 <br />Total <br />$0.00 <br />Total , $28,956.00 <br />645 NW Enterprise Drive, Suite 107 - Port St. Lucie, Florida 34986 - p 772.343.9897 - f 772.343.9404 <br />