Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Timothy Rose Contracting Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or . indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project will consist of construction of a 5' wide concrete sidewalk along <br />the west side of Indian River Boulevard from 37' Street to 53rd Street and approximately <br />432' on 53rd Street that will join an existing sidewalk to the west. The project will <br />construct pedestrian signals at Indian River Boulevard/37"' Street intersection, Indian <br />River Boulevard/41St Street intersection, and Indian River Boulevard/45th Street <br />intersection; construct drainage improvements as needed; perform earthwork <br />construction, maintenance of traffic, erosion control and miscellaneous pavement <br />markings as needed. This is an F.D.O. T. Local Agency Program (LAP) funded project FM <br />No. 436860-1-58-01. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: INDIAN RIVER BOULEVARD SIDEWALK FROM 37th STREET TO <br />53rd STREET <br />County Project Number: IRC -1415 <br />FM Number: 436860-1-58-01 <br />Bid Number: 2018026 <br />Project Address: Indian River Boulevard from 37t1 Street to 53rd Street and part <br />of 53rd Street, Vero Beach, Florida 32960 & 32967 <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />00520 - Agreement (Public Works) FOR LAP PROJECTS ONLY.doc <br />00520-2 <br />FAPurchasing\Bids\2017-2018 FY (2018000)\2018026 IRBlvd Sidewalks 37th to 53rd St\00520 -Agreement (Public Works) FOR LAP PROJECTS ONLY.doc <br />