My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-045A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-045A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 1:14:20 PM
Creation date
4/2/2018 4:24:34 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/06/2018
Control Number
2018-045A
Agenda Item Number
8.M.
Entity Name
Timothy Rose Contracting
Subject
Indian River Blvd sidewalk from 37th St. to 53rd St.
Project Number
IRC-1415
Bid Number
2018026
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KNOW ALL MEN BY THESE PRESENTS, that We, TIMOTHY ROSE CONTRACTING, INC. <br />as Principal, and <br />the WESTFIELD INSURANCE COMPANY, an Ohio Corporation, with its principal office at Westfield Center, Ohio, <br />as Surety, are held and firmly bound unto INDIAN RIVER COUNTY <br />180127th STREET VERO BEACH, FL 32960 as Obligee, in <br />the penal Sum of 5% OF AMOUNT OF BID DOLLARS, <br />lawful money of the United States of America, for the payment of which, well and truly to be made, we bind ourselves, <br />our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. <br />WHEREAS the said Principal is herewith submitting a bid or proposal for INDIAN RIVER BOULEVARD SIDEWALK <br />FROM 37th STREET TO 53rd STREET <br />NOW THEREFORE, the condition of the above obligation is such, that if the said Principal shall execute a contract <br />and give bond for the faithful performance thereof; if required by the contract, or if the Principal or Surety shall pay the <br />Obligee the difference, not exceeding the penal sum hereof, between the amount of the contract entered into in -good <br />faith to perform the work to which the bid or proposal relates and the amount bid or proposed by the Principal, then this <br />obligation shall be void; otherwise it shall remain in full force and effect. <br />SIGNED this 23rd day of JANUARY 2018 <br />TIMOTHY ROSE CONTRACTING. INC. <br />Principal �✓ <br />X51 <br />Westfiel . Inlsurance Company <br />BZ <br />c oT . L . Attorney .iri fact . <br />
The URL can be used to link to this page
Your browser does not support the video tag.