Indian River County Utilities
<br />424 22nd Stree SE Sewer Lateral Replacement
<br />t
<br />WORK COMPLETED
<br />Item No.
<br />Description
<br />Qt
<br />Unit
<br />Unit Price
<br />Scheduled Value Previous Application
<br />Amount Quantity Total
<br />This Period
<br />Quantity
<br />Total
<br />Total Com feted
<br />Quantity Total
<br />40.00
<br />220.00)
<br />9
<br />Install Mechanical Restrained Joint Ductile Iron Fitting
<br />-0.25
<br />Ton
<br />$4,100.00
<br />$
<br />1,025.00
<br />0.25
<br />1,025.00
<br />Olb
<br />Install 4" PVC Water Main
<br />40.00
<br />LF
<br />$5.50
<br />$
<br />220.00
<br />40.00
<br />220.00
<br />40.00
<br />220.00
<br />9
<br />Install Mechanical Restrained Joint Ductile Iron Fitting
<br />0.25
<br />Ton
<br />$4,100.00
<br />$
<br />1,025.00
<br />0.25
<br />1,025.00
<br />0.25
<br />1,025.00
<br />10a
<br />Install Mechanical Restrained Joints on Existing Main, 3" through
<br />6.00
<br />EA
<br />$60.00
<br />$
<br />360.00
<br />6.00
<br />360.00
<br />6.00
<br />360.00
<br />Ila
<br />Lower/Offset Pipe by Excavation After Restraining Joints, 3"
<br />40.00
<br />LF
<br />$6.00
<br />$
<br />240.00
<br />40.00
<br />240.00
<br />40.00
<br />240.00
<br />13a
<br />Grout Pipe Abandoned and Left in Place, 3" through 8"
<br />100.00
<br />LF
<br />$12.00
<br />$
<br />1,200.00
<br />100.00
<br />1,200.00
<br />100.00
<br />1,200.00
<br />23
<br />Test Holes / Potholes
<br />8.00
<br />EA
<br />$250.00
<br />$
<br />2,000.00
<br />8.00
<br />2,000.00
<br />8.00
<br />2,000.00
<br />55c
<br />Install 6" Sewer Service Lateral -Single (> 7') SDR 26
<br />100.00
<br />LF
<br />$15.00
<br />$
<br />1,500.00
<br />100.00
<br />1,500.00
<br />100.00
<br />1,500.00
<br />58
<br />Gravity Sewer Tap- Single Residential Service -4"-8"includes
<br />1.00
<br />EA
<br />$500.00
<br />$
<br />500.00
<br />1.00
<br />500.00
<br />1.00
<br />500.00
<br />65
<br />Saw Cut, Remove and Dispose of Asphalt
<br />10.00
<br />Ton
<br />$30.00
<br />$
<br />300.00
<br />10.00
<br />300.00
<br />10.00
<br />300.00
<br />66a
<br />Install Asphalt Cement Overlay -Type SP -9.5 A.C. over Existing
<br />10.00
<br />Ton
<br />$60.00
<br />$
<br />600.00
<br />10.00
<br />600.00
<br />10.00 1
<br />600.00
<br />67b
<br />Remove, Dispose of and/or Replace Rock Base Course, Compacted
<br />20.00
<br />Ton
<br />$20.00
<br />$
<br />400.00
<br />20.00
<br />400.00
<br />20.00
<br />400.00
<br />67c
<br />Remove, Dispose of and/or Replace Stabilized Sub- Grade Course,
<br />20.00
<br />Ton
<br />$14.00
<br />$
<br />280.00
<br />20.00
<br />280.00
<br />20.00
<br />280.00
<br />86a
<br />Lawn Restoration (Topsoil & Sod) Includes Watering
<br />50.00
<br />SY
<br />$2.25
<br />$
<br />112.50
<br />50.00
<br />112.50
<br />50.00
<br />112.50
<br />85a
<br />Remove and Properly Dispose of Asbestos Concrete Pipe or
<br />1.00
<br />Ton
<br />$750.00
<br />$
<br />750.00
<br />1.00
<br />750.00
<br />1.00
<br />750.00
<br />88a
<br />Well Point Dewatering Set Up, Tier Depth up to 25', (Minimum 30'
<br />1.00
<br />LS
<br />$3,500.00
<br />$
<br />3,500.00 -
<br />1.00
<br />3,500.00
<br />1.00
<br />3,500.00
<br />91
<br />Mobilization, Demobilization, MOT (based on SO% Labor Cost):
<br />1.00
<br />LS
<br />$1,298.75
<br />$
<br />1,298.75 -
<br />1.00
<br />1,298.75
<br />1.00 1
<br />1,298.75
<br />Contingency
<br />11.00
<br />1 LS
<br />714.31
<br />$
<br />714.31
<br />1.00
<br />714.31
<br />1.00 1
<br />714.31
<br />$ 15,000.56
<br />Work Deleted
<br />Olb
<br />Install 4" PVC Water Main
<br />-40.00
<br />LF
<br />$5.50
<br />$
<br />220.00
<br />40.00
<br />220.00
<br />40.00
<br />220.00)
<br />9
<br />Install Mechanical Restrained Joint Ductile Iron Fitting
<br />-0.25
<br />Ton
<br />$4,100.00
<br />$
<br />1,025.00
<br />0.25
<br />1,025.00
<br />0.25
<br />1,025.00
<br />10a
<br />Install Mechanical Restrained Joints on Existing Main, 3" through
<br />-6.00
<br />EA
<br />$60.00
<br />$
<br />360.00
<br />6.00
<br />360.00
<br />6.00
<br />360.00
<br />Ila
<br />Lower/Offset Pipe by Excavation After Restraining Joints, 3"
<br />-40.00
<br />LF
<br />$6.00
<br />$
<br />240.00
<br />40.00
<br />240.00
<br />40.00
<br />240.00
<br />85a
<br />Remove and Properly Dispose of Asbestos Concrete Pipe or
<br />-1.00
<br />Ton
<br />$750.00
<br />$
<br />750.00
<br />1.00
<br />750.00
<br />1.00
<br />750.00
<br />88a
<br />Well Point Dewatering Set Up, Tier Depth up to 25', (Minimum 30'
<br />-1.00
<br />LS
<br />$3,500.00
<br />$
<br />3,500.00
<br />1.00
<br />3,500.00
<br />1.00
<br />3,500.00
<br />Contingency
<br />-1.00
<br />1 LS
<br />714.31
<br />$
<br />714.31
<br />1.00
<br />714.31
<br />1.00
<br />714.31
<br />424 22nd St Sewer Lateral
<br />$ 6,809.31 .
<br />Total $ 8,191.25 $ $ 8,191.25 $ 8,191.25
<br />Confidential
<br />Amount Completed to Date $ 8,191
<br />Retainage @ 0%
<br />Total Completed & Stored Less Retainage $ 8,191
<br />Less Previous Payment
<br />Amount Due Contractor
<br />8,191
<br />' ✓ YL
<br />7-'-1A -
<br />3-1A
<br />Page 1
<br />
|