Laserfiche WebLink
finger canals, living shorelines, oyster and SAV restoration and public access/recreation <br />elements. This meeting will be held at the County offices. <br />Deliverables: Project planning documents and meeting minutes. <br />Task 4— Pre -Application Meeting(s) <br />Once the project team has developed a tentative plan, ESA and County staff will schedule pre - <br />application meetings with the U.S. Army Corps of Engineers (USACE) and the Florida <br />Department of Environmental Protection (FDEP) Central District and Coastal & Aquatic <br />Managed Areas (CAMA) departments to discuss the regulatory requirements for permitting and <br />constructing project elements. ESA staff will prepare figures, drawings and/or PowerPoint <br />presentations and travel to the project site, or to regulatory offices as necessary for the <br />meeting(s). <br />Deliverables: Project planning documents and meeting minutes. <br />Task 5 - Preliminary Design Report <br />ESA staff will develop a preliminary design report that will compile the information collected in <br />Tasks 1-4. The report will provide a narrative on the feasibility of restoration and habitat <br />creation in the Lost Tree Island finger canals. Items that will be discussed in the report will <br />include i) water quality & circulation improvement, i) reconnection of finger canals 3) grading <br />of islands to reduce exotic proliferation, 4) restoration/habitat creation 5) public access and <br />recreation enhancements. The report will discuss the data collected, results of meetings with <br />the County, local stakeholders, and regulatory agencies. It will include figures, tables and <br />photographs of the project sites, data collection and results. Estimated costs for project <br />elements and potential funding sources will be provided. A preliminary project schedule will be <br />developed to show project phasing. Project drawings in plan and typical cross sections will be <br />included to the extent possible provided topographic and bathymetric data are available from <br />other sources with reliable metadata. The report will provide direction on phasing project <br />elements, their cost, a preliminary schedule and an opinion of whether the project is feasible <br />going forward. <br />Deliverables: Preliminary Design Report (3 Hard Copies and 3 CDs) <br />Budget Estimate <br />Taskis Site Visit............................................................................. $ 4,450 <br />Task is Data Collection.................................................................. $ 9,600 <br />Task 3: Planning Meeting............................................................... $ 3,300 <br />Task 4: Pre -Application Meeting(s)................................................ $ 7,600 <br />Task 5: Preliminary Design Report ................................................ $16,800 <br />Total (Not-To-Exceed)........................................................... $ 41,750 <br />174 <br />