Laserfiche WebLink
o� <br />r <br />Lagoon Legacy Project: B <br />• Lost Tree Island Cuts. This project would break the dike at <br />two points on the island. This would allow for a much <br />greater, and more natural flow of water helping the Lagoon <br />with special benefits to the areas around Cache Cay. <br />+ Benefit: Water flow, which would improve water quality. <br /># Cost: Approximately $100,000 <br />Permit required from FIDEP, which would take perhaps one <br />year. <br />• * ORCA KILROY. located nearbv. <br />