Laserfiche WebLink
T <br />Lagoon Legacy Project : C = <br />o COVB Island Outfall Redesign. The COVE has a number of <br />outfalls that remove water from Orchid Island to the Lagoon. <br />Three outfalls by the Dog Park, Greytwig and the Acacia <br />Boat ramp have a lot of rock rubble by the outfall. The rock <br />rubble could be redesigned to support both tidal and sub - <br />tidal oyster recruitment. <br />Cost estimate for the three locations: Approximately <br />$251000. <br />� Benefits :Increase of nitrogen (N) and phosphorus (P) <br />absorbing Oysters, which would help clean the waters of the <br />Lagoon. <br />0 Permit required by FDEP <br />4 Volunteer Friendly Project. <br />