My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T <br />Lagoon Legacy Project : C = <br />o COVB Island Outfall Redesign. The COVE has a number of <br />outfalls that remove water from Orchid Island to the Lagoon. <br />Three outfalls by the Dog Park, Greytwig and the Acacia <br />Boat ramp have a lot of rock rubble by the outfall. The rock <br />rubble could be redesigned to support both tidal and sub - <br />tidal oyster recruitment. <br />Cost estimate for the three locations: Approximately <br />$251000. <br />� Benefits :Increase of nitrogen (N) and phosphorus (P) <br />absorbing Oysters, which would help clean the waters of the <br />Lagoon. <br />0 Permit required by FDEP <br />4 Volunteer Friendly Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.