Laserfiche WebLink
M <br />00 <br />Lagoon Legacy Project : D <br />Foot Island Merrill Barber Bridge Stabilization Project. The old <br />Miller Barber Bridge had a support structure at the Southeast side <br />of the bridge, which sat on a small island. The action of waves and <br />boat wakes is steadily eroding the island. If remediation work is not <br />done soon the island will disappear. A shoreline stabilization <br />project is proposed, which would include oyster mats, natural rock <br />and some plantings. <br />+� Cost estimate for the shoreline stabilization between $25,000 and <br />$60,000. <br />Benefits: Island preservation, oyster recruitment nitrogen (N) and <br />phos �) <br />P removal and additional fish habitat. <br />phosphorus <br />Permit required by I~DEP, which would take perhaps one year to <br />obtain. <br />