My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />00 <br />Lagoon Legacy Project : D <br />Foot Island Merrill Barber Bridge Stabilization Project. The old <br />Miller Barber Bridge had a support structure at the Southeast side <br />of the bridge, which sat on a small island. The action of waves and <br />boat wakes is steadily eroding the island. If remediation work is not <br />done soon the island will disappear. A shoreline stabilization <br />project is proposed, which would include oyster mats, natural rock <br />and some plantings. <br />+� Cost estimate for the shoreline stabilization between $25,000 and <br />$60,000. <br />Benefits: Island preservation, oyster recruitment nitrogen (N) and <br />phos �) <br />P removal and additional fish habitat. <br />phosphorus <br />Permit required by I~DEP, which would take perhaps one year to <br />obtain. <br />
The URL can be used to link to this page
Your browser does not support the video tag.