My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lagoon Legacy Project : F <br />• South Vero Storm Water Treatment Project. A lot of the <br />water from the Rockledge -South Vero area presently flows <br />untreated, into the Lagoon after rain events. This project <br />would require that some of the drainage in the area be <br />redesigned and would use gravity and perhaps one or two <br />pumps to get the water into the existing salt Marsh to the <br />east -of the drainage basin and then use the flow of water <br />through the salt marsh to remove sediment and nitrogen (N) <br />and phosphorus (P). <br />• Cost: Significant <br />• <br />Benefits: remove nitrogen (N) and phosphorus (P) sediment <br />and other pollutants from storm water from the water before <br />it aets into the Laaoon and slows down the flow of water <br />n <br />00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.