My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHISITA, <br />M&E <br />Morgan & Eklund, Inc. <br />8745 U.S. Highway 1 Phone: 772-3685384 <br />P.©. Box 701420 Fax: 772-386-3165 <br />Wabasso, Floride 32570 <br />January 3, 2018 <br />Indian River County <br />Attn: Mr. James Gray, Jr. <br />Coastal Engineer <br />180127"' Street, Building A <br />Vero .Beach, FL 32960 <br />RE: Winter 2018 Indian River County Coastal Monitoring Survey; Onshore/Offshore <br />Profiles along FDEP Range Lines R-20 to R-119 (100 Lines) <br />Dear James: <br />Morgan & Eklund, Inc. is pleased to provide you with the following proposal to furnish <br />professional land and hydrographic survey services for the above referenced project. <br />Beach profiles will include R-20 through R-119, a total of 100 (one hundred) beach profile lines. <br />All data collected will be in accordance with the FDEP-approved Physical Monitoring Plan. <br />Morgan & Eklund, Inc. will provide the County with beach profile data in ASCII file format <br />together with AutoCAD drawings signed by the surveyor. The survey will be performed in <br />January/February 2018 with drawings and reports completed in April 2018. <br />Additionally, the landward occurrence of rock outcroppings will be identified along each profile <br />line. <br />In accordance with.the scope of work as provided, I estimate our costs to be as follows: <br />I. Winter 2018 Sector 3 Beach and Dune Restoration Project Post Construction <br />Monitoring Survey (R-20 to R-60) <br />41 Onshore/offshore <br />profile lines @ $550/line......................................$ 22,550.00 <br />II. Winter 2018 Sector 7 Post Construction Monitoring (R-97 to R-108) <br />12 Onshore/Offshore <br />profile lines @ $550/line.....................................$ 6,600.00 <br />193 <br />
The URL can be used to link to this page
Your browser does not support the video tag.