My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Work Order Number 17 <br />Indian River County Department of Utility Services <br />Floridan Wellfield Assessment and Improvements <br />PROJECT UNDERSTANDING <br />Raw water is the lifeblood and the main source of water of the Oslo water treatment <br />facilities (WTP) and Hobart water treatment facilities (WTP). With recent and more <br />frequent wellpump motor failures at the Hobart water treatment plant, limitations <br />in the South WTP wellfield controls and RTU system, and on-going wellfield <br />improvements at the South Oslo road water treatment facilities, it is prudent to <br />improve the sustainability and reliability of these wells. <br />The purpose of this project is to improve the sustainability and reliability of the <br />wellfields and implement a plan to standardize equipment and operations of wells, <br />improve ireliability of the wellfields, and provide upgrades to the fiber optic and <br />controls system for the wellfields. Standardizing equipment and operations will <br />allow interchangeability of equipment among all of the wells, resulting in a more <br />robust wellfield system. <br />SCOPE OF WORK <br />A thorough evaluation of the existing wellfield performances with respect to <br />mechanical efficiency, specific capacity and performance, and electrical conditions <br />will be provided. <br />TASK 1- WELL PERFORMANCE - FIELD TESTING <br />Consultant will conduct well testing, collect field data, and update well <br />performance data collected in December 2013. <br />Consultant will perform wellfield testing of fourteen (14) wells in the North and <br />South wellfields (the new well S7 and S4 will not be included) which will consist of <br />water quality parameter testing: sand, silt density index (SDI), turbidity, hydrogen <br />sulfide, iron, pH, dissolved oxygen, and specific conductance; specific capacity <br />testing, review of SCADA system logger data, static and pumping water levels, <br />pumping rates, and specific capacity. <br />210 <br />FAUtilities\UTILITY - Engineering\WATER\Wells\Admin\1RCU Floridan Well Improvements 1.29.18.docx Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.