My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B - FEE SCHEDULE 1 8 -Jan -18 <br />216 <br />F:\Utilities\UTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 7 of 7 <br />t <br />PROJECT: IRCUWELLF[ELDASSESSMENT AND IMPROVEMENTS i <br />! <br />!SHEET <br />I OF <br />1 <br />CLIENT: Indian River County Utilities <br />(FILE NO.; <br />j <br />ESTIMATOR:MDM ( <br />j <br />; <br />fDATE:12/15/17 <br />_— <br />DESCRIPTION: <br />l <br />DIRECT LABOR <br />( MAN-HOURS) <br />—EEVALUATION, TESTING,AND ASSESSMENT <br />REGDirE� <br />— <br />_ <br />^PRINC <br />_ <br />SEN <br />PROF <br />PROF <br />TH/FH <br />DES/ <br />P2_--- <br />CLK <br />_ Pl -SUB <br />EXP <br />— <br />--- <br />_LINE <br />TOTAL <br />�'---..._---�— <br />NO. TASK <br />1 WELL PERFORMANCETESTING <br />Field Testing/coordination <br />2 <br />8 <br />16 <br />500 <br />$153 <br />$3,983 <br />Prepare Tech Memo <br />6 <br />12 <br />2 <br />$129 <br />$2,931 <br />SUB - JLA <br />$12,384 <br />$0 <br />$12,384 <br />$19,298 <br />2 EXISTING WELLASSESSMINTS <br />Kickoffineeting <br />2 <br />4 <br />4 <br />$66 <br />$1,500 <br />12 day walldhrough <br />8 <br />8 <br />16 <br />$215 <br />$4,895 <br />Hydraulic modelling <br />4 <br />4 <br />16 <br />4 <br />$164 <br />$3,728 <br />_ <br />Review motor failures (Hobart) <br />6 <br />4 <br />$90 <br />$2,040 <br />Attend review meetings <br />6 <br />81 <br />4 <br />1 <br />$1371 <br />$3,107 <br />Evalute purnp selections, spare parts, aux power <br />8 <br />8 <br />8 <br />$177 <br />$4,017 <br />Evaluate electrical (C&W 66406) <br />$7,000 <br />$0 <br />$7,000 <br />Raw water quality <br />4 <br />6 <br />$70 <br />$1,600 <br />$27,887 <br />3 SCADA SYSTEM EVALUATION <br />Review/update fiber optic improvements (CSD) <br />6 <br />6 <br />4 <br />$5,000 <br />$121 <br />$7,755 <br />Individual well ' rovernents <br />12 <br />4 <br />18 <br />4 <br />$256 <br />$5,830'— <br />SUB-C&W <br />$12,000 <br />$0 <br />$12,000 <br />$25,585 <br />4 PREPARETECH REPORT & DESIGN GUIDES <br />Meetings <br />6 <br />6 <br />$1041 <br />$2,354 <br />_ <br />Design guidelines <br />8 <br />121 <br />12 <br />$219 <br />$4,971 <br />— <br />Summary report <br />6 <br />18 <br />22 <br />12 <br />$346 <br />$7,858 <br />_ <br />$15,183 <br />TOTALHOURS, 01 <br />841 <br />901 <br />1181 <br />42 <br />$36,884 <br />$2,247 <br />$87,953 <br />$87,953 <br />LABOR ($/HOUR)' 2351 <br />2251 <br />1501-105 <br />96 <br />$0 <br />SUBTOTAL. 01 <br />189001 <br />135001 <br />123901 <br />4032 <br />0 <br />548,822 <br />$0 <br />216 <br />F:\Utilities\UTILITY - Engineering\WATER\Wells\Admin\IRCU Floridan Well Improvements 1.29.18.docx Page 7 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.