My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/13/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/13/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:33:55 PM
Creation date
4/4/2018 2:30:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/13/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE. Such facilities must first be approved by the RAILWAY and any governing bodies having <br />jurisdiction thereof and operation of the facilities shall also be subject at all time to their <br />approval. An additional license agreement may be required by the RAILWAY, depending upon <br />the location of such drainage facilities and type, size, depth and other specifications of the <br />proposed facilities, as submitted to the RAILWAY. <br />13. Lighting facilities adequate to comply with the requirements of the laws of the State <br />of Florida covering illumination of road crossing shall be installed, maintained and replaced at or <br />near this CROSSING SITE by and at the sole cost of COUNTY. <br />14. Facilities at or near the CROSSING SITE that are not specifically covered by this <br />Agreement, including but not limited to pedestrian walkways, may not be constructed by <br />COUNTY at or near the CROSSING SITE without the prior written approval of RAILWAY, <br />which approval is in RAILWAY'S sole discretion. The cost and liability for such facilities, <br />including but not limited to claims for personal injury or death or damage to property of any <br />person or persons whomsoever, shall be the sole responsibility of COUNTY. <br />15. If at any time RAILWAY, at COUNTY'S request, performs work required to be <br />performed by COUNTY hereunder, the cost and liability for such work, including but not limited <br />to claims for personal injury or death or damage to property of any person of persons <br />whomsoever, shall be the sole responsibility of COUNTY. <br />16. The COUNTY further covenants to pay the RAILWAY, within sixty (60) days after <br />presentation of the same, all bills submitted by Railway including maintenance bills as set forth <br />in Paragraph 9 above and , all bills for electricity for the lighting and illumination of the <br />CROSSING SITE if same are provided by Railway. <br />Page 249 <br />
The URL can be used to link to this page
Your browser does not support the video tag.