Florida East Coast
<br />Estimate No.: 272178Y - 09119/2017
<br />Florida East Coast Railway
<br />(FEC)
<br />GIFFORD,.(Indian River), FL
<br />45th STREET
<br />DOT# : 27217BY RAILROAD #: 2285343
<br />RRMP.: 224+4945' XORAIL#: GEMIS-42113
<br />Summary
<br />CROSSING WARNING SYSTEM $534,283.88
<br />(includes all design, requisition, labor, materials, shop wiring, and Installation)
<br />CROSSING SURFACE/RESURFACE $178,72329
<br />(Includes all design, requisition, labor, materials, and Installation)
<br />TRACK GRADE AND REHABILITATION $0.00
<br />(Includes all design, requisition, labor, materials, and installation)
<br />RAILROAD ENGINEERING $2,500,00
<br />(Includes RAILROAD Labor for Reviewing Engineering Authorizations, Field Inspections and Administrative Labor)
<br />PRELIMINARY ENGINEERING (Phase 1)
<br />(Includes CONTRACT Labor for all Engineering, Agency Coordination, and Project Management)
<br />AGREEMENTS & APPROVALS (Phase 21
<br />(Includes CONTRACT Labor for all Engineering, Agency Coordination, and Project Management)
<br />CONSTRUCTION ENGINEERING (Phase 3)
<br />(Includes CONTRACT Labor for all Engineering, Agency Coordination, and Project Management)
<br />CONSTRUCTION ENGINEERING INSPECTION (CEI)
<br />(Estimated Construction Engineering Inspection cost based on 5 days @ $1,500.00 per day)
<br />AC POWER SERVICE
<br />(Includes all Power Service Charges not included In other costs)
<br />OTHER (Description Required)
<br />TOTAL ESTIMATE COST
<br />IRC Pre -Payment (PE)
<br />IRC P.re?'ayment (PE)
<br />REMAINING ESTIMATED COST
<br />DATE: 09/1912017
<br />6/2=01 6 Check# 341063
<br />12/2.9/2016 Cheek# 348208
<br />$10,000.00
<br />46,000.00
<br />$9,000.00
<br />$7,500.00
<br />$5,000.00
<br />$0.00
<br />$7521007.77 (USD)
<br />$7,500.00
<br />-$1 D,DOD.DO
<br />$734,507.17
<br />RESPONSIBLE PARTY:
<br />Name. INDIAN RIVER COUNTY
<br />Number. IRC Project No. 1355
<br />Contact James W. Ennis, P.E. - County Engineer
<br />NOTE: This Estimate has been prepared based on site conditions, anticipated work duration periods, material prices, labor
<br />rates, manpower, resource availability, and other factors known,as of the date prepared. The actual cost for Railroad
<br />work may differ based upon the agency's requirements, their contractors work procedures, and/or other conditions that
<br />become apparent once construction commences or during the progress of the work. If any extended time elapses from
<br />the date of this Estimate, the Railroad will reserve the right to update the estimate to current price values, and require
<br />agency's approval before any work by Railroad will commence.
<br />EXHIBIT "B"
<br />Page 257
<br />
|