My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/20/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
02/20/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:39:51 PM
Creation date
4/4/2018 2:55:49 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/20/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
269
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T OF u�awvcc�� <br />United States Department of the Interior <br />FISH AND WILDLIFE SERVICE <br />'ll �v 8p9 <br />4RCy 3 Everglades Headwaters National Wildlife Refuge Complex <br />4055 Wildlife Way <br />Vero Beach, Florida 32963 <br />February 6, 2018 <br />Kendra Cope <br />Sea Turtle Coordinator/Environmental Specialist <br />Indian River County Public Works <br />180127" Street <br />Vero Beach, FL 32960 <br />772-538-0616 <br />Indian River County sea turtle monitoring assistance for 2018. <br />Dear Ms. Cope, <br />The Archie Carr National Wildlife Refuge is willing to commit to assist in the 2018 gap year <br />of sea turtle research and data collection along the north Indian River County turtle nesting <br />beach for the duration of March 1, 2018 to September 30, 2018. <br />Coordination with staff at Sebastian Inlet State Park, Indian River County, and Ecological <br />Associates Inc. will occur to fulfill requirements of Indian River County's Habitat <br />Conservation Plan. We are prepared to offer up to 3 days per week of collecting crawl data, <br />marking nests, and monitoring disturbance. This includes our equipment, materials, and <br />other supplies required during our survey days. Although we intend to fulfill the HCP <br />requirements, human safety will be highest priority and we will not survey when conditions <br />are not safe to do so. <br />In order to deliver the support, we will need to be provided with appropriate training, <br />permitting, and other requirements needed to fulfill the HCP survey needs. In addition we <br />support Indian River County serving as primary point of contact for the efforts requested. <br />Sincerely, <br />Jere y Edwardson <br />Deputy Project Leader <br />Everglades Headwaters NWR Complex <br />123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.