Laserfiche WebLink
MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS — <br />February 2, 2018 <br />Mr. Adam Heltemes, PE <br />Indian River County Engineering <br />180127 th Street <br />Vero Beach, Florida 32960 <br />RE: Final Lift - Asphalt Bond Estimate for Lily's Cay (fka Diamond Court West) <br />Project No. 2006030269-72385 <br />2006030269-72052 / SP -MA -14-05-11 <br />Indian River County, Florida <br />Dear Mr. Heltemes: <br />This letter is intended to serve as a formal request on the behalf of Arland Community <br />Development ("Developer") for a time extension on the final lift of asphalt for the Lily's Cay (fka <br />Diamond Court West) project. We have attached the following documents in order to support <br />the time extension: <br />1. Two (2) signed & sealed copies of an updated Final Lift Certified Cost Estimate <br />2. One (1) check for $660.00 for the Extension Request Fee <br />At this time, only approximately 40% of the homes approved within the project have been built. <br />The Developer and the Builder, GHO Homes, are in agreement that the final lift of asphalt be <br />installed once approximately 90%-95% build out has been achieved. We are requesting the <br />Final Lift —Asphalt Bond be extended for a period of one (1) year. <br />Please do not hesitate to contact me with any questions you may have. <br />Sincerely, <br />TELLER & MOLER, INC. <br />F 0 20118 <br />Stephen E. Moler, PE <br />Vice President <br />SEM/scg <br />enclosures <br />cc: Ryan Sweeney, IRC Planning (via E-mail) <br />Alan Resh (via E-mail) <br />Will King (via E-mail) <br />file #1329 <br />(irce_AHeitemes_FinalLiftBondEst 18-0202.doc) <br />UNTY <br />tEINGINEERING DIVV SIONI <br />1655 271' Street, Suite 2 • Vero Beach, Florida 32960 55 <br />Phone: (772) 567-5300 • Fax: (772) 794-1106 <br />mastmolr@bellsouth.net <br />