My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-063B
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-063B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:12:44 AM
Creation date
4/9/2018 3:02:10 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/03/2018
Control Number
2018-063B
Agenda Item Number
8.H.
Entity Name
Aptim Environmental and Infrastructure, Inc.
Subject
Wabasso Beach and Dune Restoration Project
Design and Permitting Services
Work Order Number 2
Area
Sector 3 (Wabasso Beach)
Project Number
2018006-2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A APT <br />Task 5: Schedule <br />March 14, 2018 <br />Page 7 of 10 <br />The schedule for the response to the RAI's and for the meeting is dependent on the extent of the questions. We <br />will attempt to respond to the questions within 60 days of receipt of the RAI's. We will inform the County if we <br />are unable to meet this schedule due to the extent of response required or the availability of meeting participants. <br />Task 5: Cost <br />The lump sum cost for this task is $33,512.00. We will coordinate with the County upon receipt of the RAI's and <br />determine whether the cost included herein is representative of the extent of work required to develop the <br />response. <br />Task 6: Construction Plans and Specifications <br />Task 6: Scope of Work <br />APTIM will develop construction plans and technical specifications that will provide the necessary details to the <br />Contractor to construct the project, establish payment criteria, and adhere to the permit conditions. It is assumed <br />that the County will provide front-end documents, including general conditions, and provide the overall format of <br />the contract documents such that the technical specifications can be incorporated without duplication or conflict <br />in terms and conditions. <br />Task 6: Deliverable <br />APTIM will provide the County an electronic version of the draft plans and specifications for the County's review <br />and comments. Once finalized, we will submit one hardcopy of the construction plans (11"X17") and technical <br />specifications (8.5"x11") to the County. We will also submit an electronic copy of the final version of the <br />construction plans and technical specifications to the County. <br />Task 6: Schedule <br />The draft deliverable for the work will be submitted within 30 days of obtainments of permits or upon request by <br />the County to begin. Once the County's comments are returned to APTIM, the finalized documents addressing <br />the comments will be submitted within 14 days. <br />Task 6: Cost <br />The lump sum cost for this task is $26,943.00. <br />Continued on next page... <br />Sector 3 — 2018006 — W0#2: Design and Permitting Proj. #631235714 <br />
The URL can be used to link to this page
Your browser does not support the video tag.