Laserfiche WebLink
EXHIBIT A <br />WORK ORDER NO. 1- AMENDMENT 2 <br />INDIAN RIVER COUNTY LANDFILL <br />SEGMENT 3 CELL 2 EXPANSION, SEGMENT 2 PARTIAL CLOSURE, AND <br />LANDFILL GAS COLLECTION SYSTEM EXPANSION <br />PHASE III - ENGINEERING SERVICES DURING CONSTRUCTION <br />This Amendment 2 to Work Order No. 1, when executed, shall be incorporated in and become part <br />of the Agreement for Consulting Services between Indian River County Solid Waste Disposal <br />District (SWDD) and CDM Smith Inc., (CONSULTANT), dated July 18, 2017 hereafter referred to as <br />the AGREEMENT. <br />BACKGROUND <br />The SWDD, the OWNER, has requested that CONSULTANT prepare this Work Order to provide <br />professional engineering services during construction for the proposed Class I Landfill Segment 3 <br />Cell 2 expansion, Segment 2 Partial Closure, and expansion of the landfill gas (LFG) collection <br />system. The proposed new cell is Cell 2 of Segment 3 (approximately 10.6 acres in size), as shown <br />on Drawing No. 5 of the 20 -Year Permit Drawings dated September 2015. Segment 3 Cell 2 will be <br />located immediately to the east of the existing Segment 3 Cell 1. The proposed Segment 2 Partial <br />Closure (approximately 25 acres in size) includes closure of the Segment 1/Infill vertical expansion <br />area and the final elevations of Segment 2, which has historically been referred to as the Segment <br />2C area. Expansion of the LFG collection system within Segment 2 is proposed to be constructed <br />concurrently with the Segment 2 Partial Closure and landfill gas collection system so that the final <br />components can be installed prior to the closure cap being constructed. This project consists of the <br />above three main elements. <br />Phase II of this project was completed and included design, permitting and bidding phase. <br />CONSULTANT was retained for the design, permitting, and bidding of the Class I Landfill Segment 3 <br />Cell 2 expansion, Segment 2 Partial Closure, and LFG collection system expansion located at the <br />Indian River County Landfill. The design included the Segment 3 Cell 2 bottom liner system, <br />leachate collection and conveyance systems, Segment 2 Partial Closure cap liner system and <br />stormwater.management facilities, and the Segment 2 LFG collection system expansion. <br />Construction also includes an access roadway, leachate pump station and force main design <br />services as requested by SWDD to support future cell expansion. The Scope of Services for Phase III, <br />Engineering Services During Construction, of this project is described below: <br />SCOPE OF SERVICES <br />CONSULTANT will provide engineering services during construction to act as the OWNER's <br />representative during the construction of the project. Based on recent discussions with SWDD staff <br />and our familiarity with the landfill site design of the project, the proposed Scope of Services <br />includes the following tasks as a continuation of the previously approved tasks: <br />TASK 2.0 - PROJECT QUALITY MANAGEMENT <br />Activities performed under this task consist of those generally administrative functions required to <br />maintain the project on schedule, within budget, and that the quality of the work products defined <br />C7 Mith A-1 jj2203_Exhihit A.doa <br />