Laserfiche WebLink
interpreter of the requirements of the Contract Documents regarding the execution <br />and progress of the work. <br />Subtask 7.6 Based on CONSULTANT's on-site observations and on review of applications for <br />payment and the accompanying data and schedules, CONSULTANT will determine <br />the amounts owing to the Contractor and recommend in writing, payments to the <br />Contractor in such amounts. <br />Subtask 7.7 For each portion of the work (Milestone 1 and Milestone 2), CONSULTANT will <br />perform an initial walkthrough to develop a preliminary checklist of items to be <br />performed by the Contractor, based upon observations made jointly between the <br />Contractor, SWDD, and CONSULTANT. For each portion of the work (Milestone 1 <br />and Milestone 2), CONSULTANT will perform a second walkthrough to identify <br />which items remain to be performed from the initial checklist and to supplement <br />that list as necessary and for the purpose of developing a joint single final punch list. <br />CONSULTANT will perform a final walk-through on both portions of the work <br />(Milestone 1 and Milestone 2), to determine if the all of the work has been <br />completed in accordance with the final punch list and Contract Documents. <br />CONSULTANT reserves the right to request additional compensation should <br />additional walkthroughs be required. <br />Subtask 7.8 CONSULTANT will assist the SWDD with project related correspondence to SWDD, <br />Contractor, regulatory agencies, and other parties; provide monthly project status <br />reports; prepare monthly progress meeting minutes; and maintain comprehensive <br />project records and documentation on file. CONSULTANT will maintain document <br />log and documentation on site during the project. <br />Subtask 7.9 CONSULTANT will complete and file daily reports to document the progress of the <br />work. <br />Subtask 7.10 CONSULTANT will monitor/check performance tests and review field test reports <br />for conformance with project contract documents. <br />Subtask 7.11 CONSULTANT will arrange for monthly progress meetings to be attended by the <br />Contractor, SWDD, and CONSULTANT's representatives. The purpose of these <br />meetings is to review the Contractor's work performed, discuss Contractor's <br />schedule and any construction/field problems. <br />The level of work estimated for this project is based on a 390 -calendar day (278 working days) <br />construction period from the Notice to Proceed to Final Completion. CONSULTANT reserves the <br />right to request additional compensation, should Final Completion of construction extend beyond <br />the 390 -calendar day (278 working days) period. <br />TASK 8.0 - SPECIAL ENGINEERING SERVICES DURING CONSTRUCTION <br />Activities performed under this task consist of supplementary and special engineering services <br />required during the construction and implementation of the project: <br />Subtask 8.1 Prepare for SWDD a set of reproducible record drawings, digital copy in AUTOCAD <br />and two Record Drawing prints showing those significant changes made during the <br />smith A-3 JJ220LExhibit A.docx <br />