My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/03/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:07:46 PM
Creation date
4/17/2018 5:18:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Scope of Services <br />Jungle Trail Shoreline Stabilization <br />for <br />Indian River County <br />RFQ 2017053 — Continuing Contract Agreement for Environmental and Biological <br />Support Services <br />March 22, 2018 <br />Background <br />In 2006, Indian River County repaired approximately 95o feet of shoreline along the right-of- <br />way of Jungle Trail immediately north of Sea Oaks Boulevard. This repaired section has <br />performed well, but Soo linear feet south of Sea Oaks Boulevard is now in need of repair. The <br />shoreline has been impacted by Hurricanes Matthew and Irma and also boat wakes from the <br />nearby Intracoastal Waterway. The County would like to implement a similar stabilization <br />project along the newly impacted Jungle Trail roadway. <br />SCOPE -OF -WORK <br />Task:L - Data Collection & Coordination <br />ESA staff will continue to work with the County to acquire historical data including topographic <br />& bathymetric survey data (or LiDAR), water quality data, aerials, oyster and seagrass maps. ESA <br />staff will conduct a submerged aquatic vegetation (SAV) survey and document the species and <br />condition of the seagrass and shoreline vegetation. <br />ESA proposes to use Morgan & Eklund to collect topographic and limited bathymetric survey <br />data in the immediate project area. M&E will prepare a topographic survey that meets the <br />Minimum Technical Standards as set forth in Chapter 61G17-6, Florida Administrative Code <br />pursuant to Section 472.027 Florida Statutes. M&E will establish a minimum of z site benchmarks <br />and reference their location upon the prepared drawing. The horizontal datum (coordinates) will <br />be referenced to the Florida State Plane Coordinate System, East Zone, North American Datum <br />of 1983/90 (NAD 83/90). The vertical datum (elevations) will be referenced to the North American <br />Vertical Datum of 1988 (NAVD 88) and will be tied to published horizontal and vertical control <br />points throughout the project area. <br />The consultant will.obtain topographic and limited bathymetric survey data (to wading depth) at <br />50 foot transects along the east shoreline of the Indian River south of Sea Oaks Boulevard as <br />depicted on Figure 1 (see attached). The locations and elevations of any significant shoreline <br />features will be collected using.Real-Time Kinematic GPS or electronic total station. The existing <br />top and toe elevations as well as grade break features will be delineated as well as locating the <br />mean high water line throughout the project area. The limited bathymetric survey will detail the <br />rock placed at the toe of slope of the living shoreline, and extend 25-5o feet waterward to wading <br />depth. M&E will locate large (>8" dbh) native trees or tree drip -edge for tightly packed tree <br />219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.