My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/03/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:07:46 PM
Creation date
4/17/2018 5:18:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�N <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM James D. Gray, Jr. <br />Natural Resources Manager <br />SUBJECT: Work Order No. 2018006-2, Aptim Environmental & Infrastructure, Inc. <br />Sector 3 Beach and Dune Renourishment — Design and Permitting <br />DATE: March 21, 2018 <br />DESCRIPTION AND CONDITIONS <br />On January 9, 2018, the Board approved a contract with Aptim Environmental & Infrastructure, <br />Inc. (Aptim) for professional coastal engineering and biological support services related to the <br />management and renourishment of the Sector 3 (Wabasso Beach) beach project area. <br />The Sector 3 project area is a 6.6 mile section of shoreline that extends from the Seaview <br />Subdivision south to the Turtle Trail beach park. The Sector 3 project area sustained damage <br />from Hurricane Matthew (2016) and Hurricane Irma (2017) and is in need of a large scale beach <br />and dune nourishment project to maintain protection to upland properties and infrastructure. <br />The County has received a fully signed Federal Emergency Management Agency (FEMA) Project <br />Worksheet (No. IRGAG01— Hurricane Matthew, FEMA 4283 -DR -FL) and is currently developing a <br />Project Worksheet with FEMA in order to replace Hurricane Irma associated storm losses within <br />the project area. <br />The proposed Work Order No. 2018006-2 includes eight (8) separate tasks pertaining to the <br />design and permitting of the Sector 3 Beach and Dune Renourishment Project. <br />Work Order No. 2018006-2 is for a lump sum amount of $258,489. <br />Work orders related to preconstruction monitoring, bidding, and construction phase services will <br />be addressed through subsequent work orders. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue as well <br />as allocation of the One Cent Sales Tax. Funding is budgeted and available for the Sector 3 Beach <br />Renouishment Project in the Beach Restoration Fund, Other Professional Services — Hurricane <br />Matthew — Sector 3, Account No.12814472-066514-17001. <br />224 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@7CODOA05\@BCL@7CODOA05.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.