My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/2018
CBCC
>
Meetings
>
2010's
>
2018
>
04/03/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 3:07:46 PM
Creation date
4/17/2018 5:18:30 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/03/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
553
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APTIM March 14, 201$ <br />Page 8 of 10 <br />,O�, <br />Task 7: Geotechnical Evaluation and Compatibility Analysis <br />Task 7: Scope of Work <br />APTIM will develop a study to investigate potential fill sources to determine their compatibility with the native <br />sand of Sector 3. Sand sources, both offshore and upland, will be preliminarily evaluated to be utilized for fill <br />material. Sediment characteristics that will be analyzed include grain size distribution, carbonate content, and <br />color. <br />Native sand of Sector 3 will be represented by geotechnical data obtained from previous studies in the County. It <br />is assumed that no additional sampling will be required; thus,.this proposal does not include native beach sampling <br />as part of the scope. A composite grain size curve of the Sector 3 native sand will be developed to compare to <br />potential fill sources. <br />Offshore sand sources will be preliminarily designed and evaluated by utilizing existing data from previous <br />offshore sand source investigations (ATM, 2001), including core logs and granularmetric data. The offshore <br />evaluation will focus on the South Borrow Area, as it has been previously permitted and successfully used in the <br />County. If additional field work of the offshore borrow area is required by FDEP, then the associated field work, <br />analysis, design, and coordination will be conducted under a separate work order. Offshore areas will be <br />evaluated in terms of available sand, proximity to the Sector 3 shoreline, and compatibility with the Sector 3 native <br />beach sand in terms of grain size distribution, carbonate content, and color. If sufficient data exists, composite <br />grain size curves and statistics will be developed to represent offshore borrow areas. These curves and composite <br />statistics will be used to evaluate the compatibility with the native sand of Sector 3. <br />Evaluation of upland sand sources will include those previously utilized for construction on the County's beaches, <br />have geotechnical data of recent representative samples of the proposed fill material, actively produce sand (or <br />can easily reestablish producing sand), have sufficient quantities available, have sufficient stockpiling area, provide <br />operational information, and are compatible with the Sector 3 native beach sand in terms of grain size distribution, <br />carbonate content, and color. If sufficient data exists, composite grain size curves will be developed to represent <br />potential upland sources. These curves and composite statistics will be used to evaluate the compatibility with <br />the native sand of Sector 3. <br />Recommendations will be provided to move forward with upland and/or offshore sand sources as fill material for <br />the Sector 3 project. If required, steps will be identified to further investigate possible upland or offshore sources. <br />Task 7: Deliverable <br />A summary of the work described above will be included as an Appendix in the Feasibility Report (Task 1), unless <br />the offshore bathymetric survey collection (Task 8) dictates this to be submitted later under separate cover. <br />Task 7: Schedule <br />APTIM will provide the deliverable with the Feasibility Report (Task 1). <br />Task 7: Cost <br />The lump sum cost for this task is $22,752.00. <br />Sector 3 — 2018006 — WO#2: Design and Permitting Proj. #631235714 <br />234 <br />
The URL can be used to link to this page
Your browser does not support the video tag.