My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-064
CBCC
>
Resolutions
>
1990'S
>
1995
>
1995-064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2018 4:10:33 PM
Creation date
4/20/2018 4:07:06 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1995-064
Approved Date
05/23/1995
Resolution Type
Development Impact
Entity Name
DeBartolo Properties Management
Subject
Indian River Mall findings of fact and conclusion of law, impact, Amended development order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
status (schedule) of guaranteed roadway expansions. This <br />Annual Status Report shall be submitted to Indian River <br />County, Florida Department of Transportation, Treasure Coast <br />Regional Planning Council and the Department of Community <br />Affairs as part of the Development of Regional Impact Annual <br />Report. <br />The Annual Status Report shall list all roadway expansions <br />needed to be constructed by phase, the guaranteed date of <br />completion for the construction of each needed expansion, the <br />party responsible for the guaranteed construction of each <br />expansion, and the form of the binding commitment that <br />guarantees construction of each expansion. <br />50. A traffic methodology meeting shall be conducted for any <br />proposed change to the Development Order that may affect <br />traffic, such as an increase in project size and extension of <br />the project buildout dates. The Florida Department of <br />Transportation, the Department of Community Affairs, Treasure <br />Coast Regional Planning Council, Indian River County, and the <br />City of Vero Beach shall be present at the meeting. Issues to <br />be discussed at the meeting include, but are not limited to: <br />trip generation rates, trip distribution and assignment, <br />passer-by rates, growth factors, application of the growth <br />factors, approved developments in the area, and proposed <br />roadway expansions. A traffic study shall be submitted to the <br />Florida Department of Transportation, Department of Community <br />Affairs, Treasure Coast Regional Planning Council, Indian <br />River County, and the City of Vero Beach which will determine <br />traffic impacts of the proposed change. This study will <br />incorporate the methodology discussed at the traffic <br />methodology meeting. The traffic study shall identify any <br />additional roadway expansions necessary to maintain the <br />subject transportation network at objective levels of service. <br />Additional building permits shall not be issued for the <br />portions of the Indian River Mall Development of Regional <br />Impact that are the subject of the proposed change until: 1) <br />a new project phasing program and roadway expansion program <br />necessary to maintain acceptable levels of service for the <br />remainder of the development has been approved by Indian River <br />County, Florida Department of Transportation, Department of <br />Community Affairs, and Treasure Coast Regional Planning <br />Council in consultation with the City of Vero Beach; and b) <br />the Development Order has been amended to reflect the new <br />phasing program and set of additional roadway expansions. <br />51. No additional building permit shall be issued after December <br />31, 1999, unless a traffic study has been conducted by the <br />developer, and submitted to and approved by Indian River <br />County, Florida Department of Transportation, Department of <br />Community Affairs, and Treasure Coast Regional Planning <br />Council, in consultation with the City of Vero Beach, which <br />demonstrate that the regional roadway network can accommodate <br />the remaining (yet to be generated) Indian River Mall <br />generated traffic and growth in background traffic beyond 1999 <br />and still be maintained at Level of Service D during peak- <br />hour/peak-season conditions. The traffic study shall: <br />a. be conducted in 1999, and <br />b. identify the roadway expansions and timing of those <br />expansions necessary to provide Level of Service D during <br />peak-hour/peak-season conditions for the subject <br />transportation network during the projected condition of <br />the project including project impacts and growth in <br />background traffic. <br />CODING: Blocked -out wording is to be deleted. Words underlined <br />are additions. <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.