My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-075
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-075
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:35:10 AM
Creation date
4/23/2018 11:14:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
04/17/2018
Control Number
2018-075
Agenda Item Number
8.L.
Entity Name
Aptim Environmental & Infrastructure, Inc.
Subject
Continuing Contract Agreement for Continuing Engineering Services
Coastal Engineering
Bid Number
RFQ 2018008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STANDARD RATE SCHEDULE (Continued) <br />(Indian River County) <br />II. EQUIPMENT Rate <br />Truck (2WD road use)................................................................... $0.565/mile <br />Truck(4WD beach use)...................................................................................... 110.00/day <br />Survey Boat (28 ft. Parker).............................................................................. <br />1,050.00/day <br />SurveyBoat (24 ft. Privateer)............................................................................ <br />790.00/day <br />SurveySea Sled......................................................................................:........... <br />310.00/day <br />AllTerrain Vehicle............................................................................................ <br />105.00/day <br />Enclosed 18" Trailer............................................................................................. <br />78.00/day <br />TrimbleRTK GPS.............................................................................................. <br />495.00/day <br />Trimble Differential GPS.................................................................................... <br />415.00/day <br />Leitz Total Station w/Data Collector.................................................................. <br />130.00/day <br />Hand Laser Range Finder................................................................15.00/day <br />RangeAzimuth System....................................................................................... <br />310.00/day <br />Odom Hydrotrack Sounder ..................... :.......................................................... <br />165.00/day <br />Heave, Pitch, Roll Compensator........................................................................ <br />215.00/day <br />Odom ES3PT Multibeam............................................................... 600 00/day <br />Speed of Sound Velocity Meter............................................................. :............. <br />63.00/day <br />Hypack/DredgePack Navigation System............................................................ <br />260.00/day <br />Hypack/Hysweep.........................................................................26 <br />0.00/day <br />Nortek AWAC ADCP high frequency deepwater wave height, direction and current profiler <br />.................................................................................................................. <br />5,000.00/month * <br />Nortek Aquadopp ADCP low frequency shallow water wave height, direction and current <br />profiler...................................................................................................... <br />2,900.00/month <br />Nortek Storm Software for wave and current data processing ............................. <br />50.00/day <br />Primer statistical package.................................................................$200/project <br />X -STAR CHIRP 512i Seismic Profiling System ............................................. 1,150.00/day <br />Seismic Profiler Thermal Printer........................................................................ 130.00/day <br />Sonar Wizard Map Seismic Data Processing Package ....................................... 155.00/day <br />Edgetech 4200 FS Sidescan Sonar System......................................................... <br />695.00/day <br />Sonar Wizard Map Sidescan Data Processing Package ...................................... <br />155.00/day <br />Geometric G-881 Magnetometer........................................................................ <br />215.00/day <br />Schonstedt GA -52B Magnetic Locator................................................................. 30.00/day <br />JetProbe with Pump............................................................................................. <br />55.00/day <br />UnderwaterTide Gauge...................................................................................... 175.00/day <br />NikonLevel/Tripod/Rod...................................................................................... 65.00/day <br />PC PowerPoint Projector ............................... :.................................. ........ <br />.......... .. 50.00/day <br />LietzHandheld Level........................................................................................... <br />10.00/day <br />OpticalReading Compass...................................................................................... 10.00/day <br />GarminHandheld GPS..............................................:............................................ 10.00/day <br />Turbidimeter.......................... :........................................................... <br />38.00/d y <br />a <br />CONFIDENTIAL AND PROPRIETARY INFORMATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.