CONTRACTOR, any Subcontractor, Supplier, or any
<br />other individual or entity directly or indirectly employed
<br />by any of them to perform any of the Work, or anyone
<br />for whose acts any of them may be liable, shall be
<br />remedied by CONTRACTOR (except damage or loss
<br />attributable to the fault of Drawings or Specifications
<br />or to the acts or omissions of OWNER or ENGINEER
<br />or ENGINEER's Consultant, or anyone employed by
<br />any of them, or anyone for whose acts any of them
<br />may be liable, and not attributable, directly or
<br />indirectly, in whole or in part, to the fault or negligence
<br />of CONTRACTOR or any Subcontractor, Supplier, or
<br />other individual or entity directly or indirectly employed
<br />by any of them). CONTRACTOR's duties and
<br />responsibilities for safety and for protection of the
<br />Work shall continue until such time as all the Work is
<br />completed and ENGINEER has issued a notice to
<br />OWNER and CONTRACTOR in accordance with
<br />paragraph. 14.07.13 that the Work is acceptable
<br />(except as otherwise expressly provided in connection
<br />with Substantial Completion).
<br />6.14 Safety Representative
<br />A. CONTRACTOR shall designate a qualified
<br />and experienced safety representative at the Site
<br />whose duties and responsibilities shall be the
<br />prevention of accidents and the maintaining and
<br />supervising of safety precautions and programs.
<br />6.15 Hazard Communication Programs
<br />A. CONTRACTOR shall be responsible for
<br />coordinating any exchange of material safety data
<br />sheets or other hazard communication information
<br />required to be made available to or exchanged be-
<br />tween or among employers at the Site in accordance
<br />with Laws or Regulations.
<br />6.16 Emergencies
<br />A. In emergencies affecting the safety or protea
<br />tion of persons or the Work or property at the Site or
<br />adjacent thereto, CONTRACTOR is obligated to act to
<br />prevent threatened damage, injury, or loss.
<br />CONTRACTOR shall give ENGINEER prompt written
<br />notice if CONTRACTOR believes that any significant
<br />changes in the Work or variations from the Contract
<br />Documents have been caused thereby or are required
<br />as a result thereof. If ENGINEER determines that a
<br />change in the Contract Documents is required be-
<br />cause of the action taken by CONTRACTOR in
<br />response to such an emergency, a Work Change
<br />Directive or Change Order will be issued.
<br />6.17 Shop Drawings and Samples
<br />A. CONTRACTOR shall submit Shop Drawings
<br />to ENGINEER for review and approval in accordance
<br />with the acceptable schedule of Shop Drawings and
<br />Sample submittals. All submittals will be identified as
<br />ENGINEER may require and in the number of copies
<br />specified , in the General Requirements. The data
<br />shown on the Shop Drawings will be complete with
<br />respect to quantities, dimensions, specified perfor-
<br />mance and design criteria, materials, and similar data
<br />to show ENGINEER the services, materials, and
<br />equipment CONTRACTOR proposes to provide and
<br />to enable ENGINEER to review the information for the
<br />limited purposes required by paragraph 6.17.E.
<br />B. CONTRACTOR shall also submit Samples to
<br />ENGINEER for review and approval in accordance
<br />with the acceptable schedule of Shop Drawings and
<br />Sample submittals. Each Sample will be identified
<br />clearly as to material, Supplier, pertinent data such as
<br />catalog numbers, and the use for which intended and
<br />otherwise as ENGINEER may require to enable ENGI-
<br />NEER to review the submittal for the limited purposes
<br />required by paragraph 6.17.E. The, numbers of each
<br />Sample to be submitted will be as specified in the
<br />Specifications.
<br />C. Where a Shop Drawing or Sample is required
<br />by the Contract Documents or the schedule of Shop
<br />Drawings and Sample submittals acceptable to ENGI-
<br />NEER as required by paragraph 2.07, any related
<br />Work performed prior to ENGINEER's review and
<br />approval of the pertinent submittal will be at the sole
<br />expense and responsibility of CONTRACTOR.
<br />D. Submittal Procedures IN
<br />1. Before submitting each Shop
<br />Drawing or Sample, CONTRACTOR shall have
<br />determined and verified:
<br />a. all field measurements, quantities,
<br />dimensions, specified performance criteria,
<br />installation requirements, materials, catalog
<br />numbers, and similar information with
<br />respect thereto;
<br />b. all materials with respect to intended
<br />use, fabrication, shipping, handling, storage,
<br />assembly, and installation pertaining to the
<br />performance of the Work;
<br />c. all information relative to means,
<br />methods, techniques, sequences, and
<br />procedures of construction and safety
<br />W700 - General Conditions Master
<br />00700 - 24