Laserfiche WebLink
C. Rentals of all construction equip- <br />ment and machinery, and the parts thereof <br />whether rented from CONTRACTOR or others <br />in accordance with rental agreements approved <br />by OWNER with the advice of ENGINEER, and <br />the costs of transportation, loading, unloading, <br />assembly, dismantling, and removal thereof. <br />All such costs shall be in accordance with the <br />terms of said rental agreements. The rental of <br />any such equipment, machinery, or parts shall <br />cease when the use thereof is no longer <br />necessary for the. Work.. <br />d. Sales, consumer, use, and other <br />similar taxes related to the Work, and for which <br />CONTRACTOR is liable, imposed by Laws and <br />Regulations. <br />e . Deposits lost for causes. other than <br />negligence of CONTRACTOR, any Sub- <br />contractor, . or anyone directly or indirectly <br />employed by any of them or for whose acts any - <br />of them may be liable, and royalty payments <br />and fees for permits and licenses. <br />f. Losses and damages (and related <br />expenses) caused by damage to the Work, not <br />compensated by insurance or otherwise, sus- <br />tained by CONTRACTOR in connection with <br />the performance of the Work (except losses <br />and damages within the deductible amounts of <br />property insurance established in accordance <br />with paragraph 5.06.13), provided such losses <br />and damages have resulted from causes other <br />than the negligence of CONTRACTOR, any <br />Subcontractor, or anyone directly or indirectly <br />employed by any of them or for whose acts any <br />of them may be liable. Such losses shall <br />include settlements made with the written <br />consent and approval of OWNER. No such <br />losses, damages, and expenses shall be <br />included in the Cost of the Work for the <br />purpose of determining CONTRACTOR's fee. <br />g. The cost of utilities, fuel, and sanitary <br />facilities at the Site. <br />h. Minor expenses such as telegrams, <br />long distance telephone calls, telephone service . <br />at the Site, expressage, and similar petty cash <br />items in connection with the Work. <br />L When the Cost of the Work is used to <br />determine the value of a Change Order or of a <br />Claim, the cost of premiums for additional <br />Bonds and insurance required because of. the <br />changes in the Work or caused by the event <br />giving rise to the Claim. <br />j. When all the Work is performed on the <br />basis of cost-plus, the costs of premiums for all <br />Bonds and insurance CONTRACTOR is <br />required by the Contract Documents to <br />purchase and maintain. <br />B. Costs Excluded. The term Cost of the Work <br />shall not include any of the following items: <br />1. Payroll costs and other compensation <br />of CONTRACTOR's officers, executives, princi- <br />pals (of partnerships and sole proprietorships), <br />general managers, engineers, architects, <br />estimators, attorneys, auditors, accountants, <br />purchasing and contracting agents, expediters, <br />timekeepers, clerks, and other personnel <br />employed by CONTRACTOR, whether at the <br />Site or in CONTRACTOR's principal or branch <br />office for general administration. of the Work <br />and not specifically included in the agreed upon <br />schedule of job classifications referred to in <br />paragraph 11.01.A.1 or specifically covered by <br />paragraph 11.01.A.4, all of which are to be <br />considered administrative costs covered by the <br />CONTRACTOR's fee. <br />2. Expenses of CONTRACTOR's princi- <br />pal and branch offices other than <br />CONTRACTOR's office at the Site. <br />3. Any part of CONTRACTOR's capital <br />expenses, including interest on <br />CONTRACTOR's capital employed for the <br />Work and charges against CONTRACTOR for <br />delinquent payments. <br />4. Costs due to the negligence of CON- <br />TRACTOR, any Subcontractor; or anyone <br />directly or indirectly employed by any of them or <br />for whose acts any of them may be liable, <br />including but not limited to, the correction of <br />defective Work, disposal of materials or <br />equipment wrongly supplied, and making good <br />any damage to property. <br />5. Other overhead or general expense <br />costs of any Idnd and the costs of any item not <br />specifically, and expressly included in <br />paragraphs 11.01.A and 11.01.13. <br />C. CONTRACTOR's Fee. When all the Work is <br />performed on the basis of cost-plus, CONTRACTOR's <br />fee shall be determined as set forth in the Agreement. <br />When.the value of any Work covered by a Change <br />00700 - General Conddlons Master <br />00700-33 <br />F*Vh"ic Wor6-%ENGINEERING DMSION PROJECM1736 IRC Health Department Roof Replacement Pmject%i AfthSid DocurtrentsWlaster Contract DomxrmtA00700 - General <br />CordAbns Master.doc <br />