My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Documents, by a- mutually agreed lump sum <br />(which may include an allowance for overhead <br />and profit not necessarily in accordance with <br />paragraph 12.01.C.2); or <br />3. where the Work involved is not cov- <br />ered by unit prices contained in the Contract <br />Documents and agreement to a lump sum is <br />not reached under paragraph 12.01.13.2, on the <br />basis of the Cost of the Work (determined as <br />provided in paragraph 11.01) plus a <br />CONTRACTOR's fee for overhead and profit <br />(determined as provided in paragraph 12.01.C). <br />C. CONTRACTOR's Fee. The <br />CONTRACTOR's fee for overhead and profit shall be <br />determined as follows: <br />a mutually acceptable fixed fee; or <br />2. if a fixed fee is not agreed upon, then <br />a fee based on the following percentages of the <br />various portions of the Cost of the Work: <br />a. for costs incurred under para- <br />graphs 11.01.X1 and 11.01.A.2, the <br />CONTRACTOR's fee shall be 15 Percent; <br />b. for costs incurred under paragraph <br />11.01.X3, the CONTRACTOR's fee shall <br />be five percent~ <br />c. where one or more tiers of subcon- <br />tracts are on the basis of Cost of the Work <br />plus a fee and no fixed fee is agreed upon, <br />the intent of paragraph 12.01.C.2.a is that <br />the Subcontractor who actually performs <br />the Work, at whatever tier, will be'paid a fee <br />of 15 percent of the costs incurred by such <br />Subcontractor under paragraphs 11.01.X1 <br />and 11.01.A.2 and that any higher tier <br />Subcontractor and CONTRACTOR will <br />each be paid a fee of five percent of the <br />amount paid to the next lower tier Subcon- <br />tractor, <br />d. no fee shall be payable on the <br />basis of costs itemized under paragraphs <br />11.01.X4, 11.01.X5, and 11.01.6; <br />e. the amount of credit to be allowed <br />by CONTRACTOR to OWNER for any <br />change which results in a net decrease in <br />cost will be the amount of the actual. net <br />decrease in cost plus a deduction in <br />CONTRACTOR's fee by an amount equal <br />to five percent of such net decrease; and <br />f. when both additions and credits are <br />involved. in any one change, the adjustment <br />in CONTRACTOR's fee shall be computed <br />on the basis of the net change in <br />accordance. with ,paragraphs 12.01.C.2.a <br />through 12.01.C.2.e, inclusive. <br />12.02 Change of Contract Times <br />A The Contract Times (or Milestones) may only <br />be changed by a Change Order or by a Written <br />Amendment Any Claim for an adjustment in the <br />Contract Times (or Milestones) shall be based on <br />written notice submitted by the party making the claim <br />to the ENGINEER and the other party to the Contract <br />in accordance with the provisions of paragraph 10.05. <br />B. Any adjustment of the Contract Times (or <br />Milestones) covered by a Change Order or of any <br />Claim for an adjustment in the Contract Times (or <br />Milestones) will be determined in accordance with the <br />provisions of this Article 12. <br />12.03 Delays Beyond CONTRACTOR's Control <br />A Where CONTRACTOR is prevented from <br />completing any part of the Work within. the Contract <br />Times (or Milestones) due to delay beyond the control <br />of CONTRACTOR, the Contract Times (or <br />Milestones) will be extended in an amount equal to the <br />time lost due to such delay if a Claim is made therefor <br />as provided in paragraph 12.02.A Delays beyond the <br />control of CONTRACTOR shall include, but not be <br />limited to, acts or neglect by OWNER, acts or neglect <br />of utility owners or other contractors performing other <br />work as contemplated by Article 7, fires, floods,. <br />epidemics, abnormal weather conditions, or acts of <br />God. <br />12.04 Delays Within CONTRACTOR's Control <br />A The Contract Times (or Milestones) will not be <br />extended due to delays within the control of <br />CONTRACTOR. Delays attributable to and within the <br />control of a Subcontractor or Supplier shall be <br />deemed to be delays within the control of CONTRAC- <br />TOR. <br />12.05. Delays Beyond OWNER's and <br />CONTRACTOR's Control <br />A Where CONTRACTOR is prevented from <br />completing any part of the Work within the Contract <br />Times (or Milestones) due to delay beyond the control <br />of both OWNER and CONTRACTOR, an extension of <br />the Contract Times (or -Milestones) in an amount <br />00700 - General Conditions Mester <br />00700-35 <br />F:Vkbk Works%ENGINEERING DMSION PROJECM17361RC Health Department Roof Replacement Projeclll,Admin181d DowxnentsWaster Conhad DoanmW00700 - General <br />Conditions Master.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.