My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
parties that might entitle CONTRACTOR to be <br />paid additionally by OWNER or entitle OWNER <br />to withhold payment to CONTRACTOR. <br />4. Neither ENGINEER's review . of <br />CONTRACTOR's Work for the purposes of <br />recommending payments nor, ENGINEER's <br />recommendation of any payment, including final <br />payment, will impose responsibility on <br />ENGINEER to supervise, direct, or control the <br />Work or for the means, methods, techniques, <br />sequences, or procedures of construction, or <br />the safety precautions and programs incident <br />thereto, or for CONTRACTOR's failure to <br />comply with Laws and Regulations applicable to <br />CONTRACTOR's performance of the Work. <br />Additionally, said review or recommendation will <br />not impose responsibility on ENGINEER to <br />make any examination to ascertain how or for <br />what purposes CONTRACTOR has used the <br />moneys paid on account of the Contract Price, <br />or to determine that title to any of the Work, <br />materials, or equipment has passed to <br />OWNER free and clear of any Liens. <br />5. ENGINEER may refuse to recom- <br />mend the whole or any part of any payment if, <br />in ENGINEER's opinion, it would be incorrect to <br />make the representations to OWNER referred <br />to in paragraph 14.02.13.2. ENGINEER may <br />also refuse to recommend any such payment <br />or, because of subsequently discovered <br />evidence or the results of subsequent <br />inspections or tests, revise or revoke any such <br />payment recommendation previously made, to <br />such extent as may be necessary in. <br />ENGINEER's opinion to protect OWNER from <br />loss because: <br />a. the Work is 'defective, or completed <br />Work has. been damaged, requiring <br />correction or replacement; <br />b. the Contract Price has been reduced <br />by Written Amendment or Change Orders; <br />c. OWNER has been required to correct <br />defective Work or complete Work in accor- <br />dance with paragraph 13.09; or <br />eme of any of the events enumer- <br />C. Payment Becomes Due <br />I 7=, -To <br />M. N M, I N r ="7T <br />r_1 rz M 7. M IN. <br />D. Reduction in Payment <br />1. OWNER may refuse to make <br />payment of the full amount recommended .by <br />ENGINEER because: <br />a. claims have been made against <br />OWNER on account of CONTRACTOR's <br />performance or furnishing of the Work; <br />b. Liens have been filed in connection <br />with the Work, except where <br />CONTRACTOR has delivered a specific <br />Bond satisfactory to OWNER to secure the <br />satisfaction and discharge of such Liens; <br />c. there are other items entitling OWN- <br />ER to a set-off against the amount <br />recommended; or <br />d. OWNER has actual knowledge of the <br />occurrence of any of the events enumerated <br />in paragraphs \14.02.B.5.a through <br />14.02.B.5.c or paragraph 15.02A <br />2. If OWNER refuses to make payment <br />of the full amount recommended by <br />ENGINEER, OWNER must give <br />CONTRACTOR immediate written notice (with <br />a copy to ENGINEER) stating the reasons for <br />such action and promptly pay CONTRACTOR <br />any amount remaining after deduction of the <br />amount so withheld. OWNER shall promptly <br />pay CONTRACTOR the amount so withheld, or <br />any adjustment thereto agreed to by OWNER <br />and CONTRACTOR, when CONTRACTOR <br />.corrects to OWNER's satisfaction the reasons <br />for such action. <br />3. If it is subsequently determined that <br />OWNER's refusal of payment was not justified, <br />the amount wrongfully withheld shall be treated <br />as an amount due as determined by paragraph <br />14.02.C.1. <br />14.03 CONTRACTOR's Warranty of Tide . . <br />A CONTRACTOR warrants and guarantees <br />that title to all Work, materials, and equipment covered <br />by any Application for Payment, whether incorporated <br />W700 - General CoW ions Master <br />00700-40 <br />F:MhNic WorkMENGINEERING DMSION PROJECTSt1736IRC Health Depatnent Roof Replaoement Projectki4 M4n%S1d Doamrerds%Wer Cadrad Dowments100700 - General <br />Conftons Master.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.