Laserfiche WebLink
Article Title <br />Article Number <br />Introduction <br />SC -1.00 <br />Defined Terms <br />SC. —1.01 <br />Terminology <br />SC —1.02 <br />Before Starting Construction <br />SC — 2.05 <br />Preconstruction Conference <br />SC — 2.06 <br />Coordination of Plans, Specifications, and Special. Provisions <br />SC — 3.06 . <br />Subsurface and Physical Conditions <br />SC — 4.02 <br />Performance, Payment and Other Bonds <br />SC — 5.01 <br />Certificates of Insurance <br />SC — 5.03 <br />CONTRACTOR's Liability Insurance <br />SC — 5.04 <br />OWNER's Liability Insurance <br />SC — 5.05 <br />Property Insurance <br />SC — 5.06 <br />Waiver of Rights <br />SC — 5.07 <br />Receipt and Application of Insurance Proceeds <br />SC — 5.08 <br />Acceptance of Bonds and Insurance; Option to Replace <br />SC — 5.09 <br />Labor; Working Hours <br />SC — 6.02 <br />Concerning Subcontractors, Suppliers and Others <br />SC — 6.06 <br />Permits SC — 6.08 <br />Cost of the Work SC —11.01 <br />Test and Inspections SC -13.03 <br />OWNER May Stop the Work SC -13.05 <br />Correction Period SC —13.07 <br />Progress Payments SC —14.02 <br />Substantial Completion SC —14.04 <br />606004' . . <br />OO80Q 'Supplementary Conditions 05=13 reV_ <br />00800 IF:11uhlic Works\ENGINEERING DIVISION PROJECTSt1736 RC Jail Canipex Roof Re*wmen1Aep* ftjeant•Admin0d DoaxbenWAaeter Contract . <br />poamKmts100800 -- sup*Wwitary:Condrgm 05-13 rev.doc <br />