My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-062A
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-062A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2020 10:08:58 AM
Creation date
4/25/2018 4:40:43 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/03/2018
Control Number
2018-062A
Agenda Item Number
8.E.
Entity Name
Indian River County Jail Complex
Subject
Roofing replacement, recover, and repair project
Project Number
IRC-1735
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bstantial Completion, Engineer will <br />C. At the time of delivery of the tentative certificate: of Su <br />deliver to .Owner and Contractor a written recommendation as to division of .responsibilities <br />pending final payment between' Owner and Contractor .with. respect to security, operation, <br />safety, 'arid protection of the Worts, maintenance, heat, utilities., insurance, and warranties and . <br />guarantees <br />SC-1.4.07 Final Payment. <br />SC-14.07.C.1. Delete paragraph. GC-14.07.C.1 in its entirety and insert the following <br />paragraph in its place: <br />C. Payment Becomes Due <br />1. Payment shall be made by OWNER tq •CONTRACTOR according to the" Local <br />Government Prompt Payment Acf , Florida Statutes section 218.70, et. seq. <br />SC-15.01 OWNER May Suspend Work <br />SC-15.01.A Delete the last sentence in paragraph GG-15.01.A and insert the following in its <br />place. <br />CONTRACTOR shall be allowed an extension of the Contract Times, directly attributable to any <br />such suspension if CONTRACTOR makes a Claim for an extension as provided in paragraph <br />10.05. CONTRACTOR shall not be allowed an adjustment of the Contract Price and <br />CONTRACTOR shall not be paid on account of loss of anticipated profits or revenue or other eco- <br />nomic loss arising out of or resulting from such Work suspension. <br />SC-15.02 OWNER May Terminate For Cause <br />SC-15.02.A.5 and SC-15.02.A.6 Add the following new paragraphs • immediately after <br />paragraph GC-15.02.A.4. <br />5. CONTRACTOR's violation of Section 02225 —"Erosion Control and Treatment of <br />Dewatering Water From the Construction Site." <br />__.6.__ CONTRACTOR's .failure- to--make-payment to__ Subcontracto.m.or _Suppliers _ for __ __ <br />materials or labor in accordance with the respective agreements between the <br />CONTRACTOR and the Subcontractors or Suppliers. <br />SC45.04 CONTRACTOR May Stop Work or Terminate <br />SC-15.04 Delete the following text from the first sentence of paragraph GC-15.04.A: <br />�ails fGF 30 days to pay GONT-R.AGT-OR any sum Ii y deteFmined to- be due, <br />SC-15.04 Delete the following text from the second sentence of paragraph GC-15.04.A: <br />OF GVMER has failed fGF 39 CONTRACTOR any sum finally detemined to <br />due; <br />00800710... . <br />._ 00800 - Supplementary 3 Condlbons 05- rev <br />1 <br />00800:10F:tPirhllc Wbd(sWNGINEERING DMSION PROJECTS11735 IRC Jaa Cwrp.0 Roof Rep w*.rtt-Repair PmJ ftI-Adn*XBid DwjrrW t %M-Mer Cmh d <br />Do&m daWf)800.= Supple m*my CoriMmm 05-43 rev.doc.-: <br />
The URL can be used to link to this page
Your browser does not support the video tag.