Laserfiche WebLink
DATE OF ISSUANCE: <br />SECTION 00948 - Work Change Directive <br />EFFECTIVE DATE: <br />No. <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: IRC JAIL COMPLEX ROOFING REPLACEMENT, RECOVER AND REPAIR <br />PROJECT <br />OWNER's Project No. IRC -1735 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />n Unit Prices <br />[3 Lump Sum <br />a Other. <br />0 By Change Order: <br />Method of determining change in <br />Contract Times <br />0 Contractor's Records <br />❑ Engineer's Records <br />II Other <br />J] By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date: <br />Date., <br />Work Change Directive Form <br />00948-1 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1735 IRC Jail Compex Roof Replacement -Repair Projectll-Admin\Bid <br />DocumentsWlaster Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />